My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/25/1996 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1996
>
11/25/1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2017 1:09:06 PM
Creation date
8/7/2017 12:59:29 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/25/1996
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM NO. 7 <br />STAFF ORIGINATOR: David Ahrens, City Engineer/Publc Works Director <br />DATE: November 22, 1996 <br />TOPIC: PUBLIC HEARING, 35W/TH 49 Interchange Corn <br />Development Area Trunk Utilities <br />INTRODUCTION: <br />On October 28, 1996, the City Council accepted the feasibility report and cal <br />a public hearing for the 35W/49 Interchange Commercial Development Area <br />Trunk Utility Project. The proposed project will provide water and sanitary sewer <br />service to the property south of 35W adjacent to Lake Drive (refer to Exhibit A). <br />The proper notices have been mailed and published notifying property owners of <br />the public hearing per State Statutes. In a separate agenda item under the City <br />Engineers Report, Council will be asked to consider ordering the project and <br />preparation of plans and specifications. <br />BACKGROUND; <br />This interchange has received a lot of interest from developers to construct <br />commercial and light industrial businesses. Also, the City is currently studying <br />the concept of developing a Town Center at the southeast quadrant of the <br />35W/49 interchange. It is necessary that watermain and sanitary sewer be <br />extended to serve the properties on the south side of 35W in order for the <br />commercial and light industrial projects to move ahead. <br />Proposed Improvements <br />The proposed improvements include the construction of approximately 4,400 feet <br />of sanitary sewer and watermain. Construction will start at the south end of`ti <br />utility jacking under 35W to be completed by the Centennial Middle School U.y <br />Project. The utilities will extend north along the south side of 35W and the Oasis <br />gas station to the west side of Lake Drive. The utilities are sized appropriately to <br />accommodate ultimate development of the properties in this area., Refer to <br />Exhibit B1 and B2 for location of proposed improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.