My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2015-013 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
2015
>
2015-013 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2017 3:16:26 PM
Creation date
8/11/2017 9:40:15 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
12/28/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the City, or obstruct or hinder in any manner the various existing utilities <br />serving the residents of the City. To the extent consistent with the City Code, <br />City policies, procedures, rules and regulations, System cable and facilities may <br />be constructed overhead where poles exist and electric or telephone lines or both <br />are now overhead. However, in no case may the Grantee install poles in areas of <br />the City where underground facilities are generally used by the utilities already <br />operating. If the City, at a future date, requires all electric and telephone lines to <br />be placed underground in all or part of the City, the Grantee shall, within a <br />reasonable time, similarly move its cables and lines. If the City reimburses or <br />otherwise compensates any Person using the Rights -of -Way for the purpose of <br />defraying the cost of any of the foregoing, the City shall also reimburse the <br />Grantee in the same manner in which other Persons affected by the requirement <br />are reimbursed. If the funds are controlled by another governmental entity, the <br />City shall not oppose or otherwise hinder any application for or receipt of such <br />funds on behalf of the Grantee. <br />3.5 Installation of Facilities. <br />3.5.1 No poles, towers, conduits, amplifier boxes, pedestal mounted terminal boxes, <br />similar structures or other wire -holding structures shall be erected or installed by <br />the Grantee without obtaining any required permit or other authorization from the <br />City. <br />3.5.2 No placement of any pole or wire holding structure of the Grantee is to be <br />considered a vested fee interest in the Rights -of -Way or in City property. <br />Whenever feasible, all transmission and distribution structures, lines, wires, <br />cables, equipment and poles or other fixtures erected by the Grantee within the <br />City are to be so located and installed as to cause minimum interference with the <br />rights and convenience of property owners. <br />3.6 Safety Requirements. <br />3.6.1 All applicable safety practices required by law shall be used during construction, <br />maintenance and repair of the System. The Grantee agrees, at all times, to <br />employ ordinary and reasonable care and to install and maintain in use commonly <br />accepted methods and devices for preventing failures and accidents that are likely <br />to cause damage or injuries to the public or to property. All structures and all <br />lines, equipment and connections in the Rights -of -Way shall at all times be kept <br />and maintained in a safe condition, consistent with applicable safety codes. <br />3.6.2 The Grantee's construction, operation or maintenance of the System shall be <br />conducted in such a manner as not to interfere with City communications <br />technologies related to the health, safety and welfare of City residents. <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.