My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-19-2007 Charter Packet
LinoLakes
>
Charter Commission
>
Agenda Packets
>
1981 - 2021 Agenda Packets - Charter Commission
>
2007 Packets
>
07-19-2007 Charter Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2021 5:56:40 PM
Creation date
9/8/2017 12:56:39 PM
Metadata
Fields
Template:
Charter Commission
Charter Meeting Type
Regular
Charter Document Type
Packets
Supplemental fields
Date
7/19/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Recycle Existing Pavement <br />Financing: Lot/Unit Assessment <br />Commercial/Industrial = 50% of project cost up to maximum <br />assessment rate <br />Residential = 50% of project cost up to maximum assessment rate <br />City contributes balance from General Fund, State Aid <br />Funds, or other sources. <br />B. Street Maintenance. <br />1. Overlay (OCI 40-70, "Marginal" category) <br />Includes: Crack Filling <br />Milling Surface <br />Patching <br />Pothole Subgrade and Base Correction <br />Repair or Replace Concrete Curb and Gutters <br />1 '/2 Inch Bituminous Surface Overlay <br />Financing: City General Fund or other sources <br />2. Sealcoat (OCI 70-100, "Adequate" category) <br />Includes: Pothole Filling <br />Crack Filling <br />Sealcoat <br />Financing: City General Fund or other sources <br />IV. PROJECT SELECTION CRITERIA <br />The OCI rating shall serve as the base criteria for project selection. In addition to the <br />OCI, streets shall be evaluated according to Average Daily Traffic (ADT), Stormwater <br />Management, Public Utilities and project priority groupings to achieve economies of <br />scale. The City Engineer shall annually prepare a five year Street Maintenance & <br />Reconstruction Plan based on these criteria for review and approval by the City Council. <br />The components of the Pavement Management Program (PMP) will be financed as <br />follows: <br />A. Maintenance (Sealcoating and Overlays) — The City will levy a property tax each <br />year to pay for annual maintenance costs as outlined in the PMP. <br />�a <br />Local Street Reconstruction — The City will use: <br />Pavement Management Policy 2 05/09/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.