Laserfiche WebLink
Anoka County Multi-Jurisdictional <br />All Hazards Mitigation Plan <br /> 220 <br /> <br />2.1.11 Inspect replace storm water control structures. Coon Rapids Coon Rapids 125000 1250000 SAA Completed <br />Goal 3: Improve traffic flows, reduce congestion, upgrade critical bridge and infrastructure, improve emergency response times; establis h plans, <br />implement plans. <br />Objective 3.1: Improve transportation system by widening US Highway 10 and replacing Hanson Boulevard interchange. <br />Action Action Project Description Jurisdiction Responsibility Estimated <br />Cost <br />Estimated <br />Benefit <br />Funding <br />Sources <br />Status <br />3.1.1 Complete traffic engineering and design work. Coon Rapids Coon Rapids <br />URS <br />consultant <br />2000000 10000000 Coon <br />Rapids and <br />County <br />Funds <br />Completed <br />3.1.2 Joint application for traffic control federal funding. Coon Rapids Coon Rapids <br />URS <br />consultant <br />50000 100000 SAA Completed <br />3.1.3 Traffic flow Cooperative construction agreements. Coon Rapids Coon Rapids <br />Co. MNDOT <br />4000000 4000000 SAA Completed <br />3.1.4 Legislative lobbying efforts for traffic control funds. Coon Rapids Coon Rapids 5000 50000 City Budget Completed <br />3.1.5 Joint powers lobbying for traffic control funds. Coon Rapids Coon Rapids <br />Co. <br />5000 50000 City Budget Completed <br />3.1.6 MNDOT Hwy 10 corridor plan for 2030 Vision project. Coon Rapids Coon Rapids 20000 100000 City Budget <br />Grant Fund <br />Completed <br />3.1.7 Complete construction of Hanson / TH10 interchange. Coon Rapids Fed Govt <br />Coon Rapids <br />Co. MNDOT <br />19000000 90000000 City-3M, Co- <br />4M, <br />MNDOT- <br />6.5M, Fed- <br />5.5M <br />Completed <br />3.1.8 Complete Coon Rapids portion of MNDOT’s TH 10 widening. Coon Rapids MNDOT 30000000 90000000 City-4M Co- <br />5.5M <br />MNDOT- <br />15M Fed- <br />5.5M <br />Completed <br />Goal 1: Increase Safety for Vehicle and Pedestrian Traffic