Laserfiche WebLink
Anoka County Multi-Jurisdictional <br />All Hazards Mitigation Plan <br /> 224 <br /> <br />1.1.1 Soil test and Survey area to construct flood protection base <br /> <br />Continue to improve jurisdictional capabilities to prepare for, <br />respond to, mitigate, and recover from natural and technological <br />disasters. <br />Fridley Private <br />Industry <br />25,000 1000000 Multi-Gov Continued <br />1.1.2 Design/Engineer a stable flood protection base <br /> <br />Continue to improve jurisdictional capabilities to prepare for, <br />respond to, mitigate, and recover from natural and technological <br />disasters. <br />Fridley Private <br />Industry <br />25,000 1000000 Multi-Gov Continued <br />1.1.3 Construct flood protection base <br /> <br />Continue to improve jurisdictional capabilities to prepare for, <br />respond to, mitigate, and recover from natural and technological <br />disasters. <br />Fridley Private <br />Industry <br />205,000 2000000 Multi-Gov Continued <br />Objective 1.2: Reduce the impact of neighborhood flash flooding with detention pond upgrade <br />Action Action/Project Description Jurisdiction Responsibility Estimated <br />Cost <br />Estimated <br />Benefit <br />Funding <br />Sources <br /> <br />1.2.1 Survey/design/engineer north detention pond area <br /> <br />Continue to improve jurisdictional capabilities to prepare for, respond <br />to, mitigate, and recover from natural and technological disasters. <br />Fridley City 10,000 100000 Multi-Gov Continued <br />1.2.2 Build-up berm or levee <br /> <br />Continue to improve jurisdictional capabilities to prepare for, <br />respond to, mitigate, and recover from natural and technological <br />disasters. <br />Fridley City 20,000 100000 Multi-Gov Continued <br />1.2.3 Purchase a pump <br /> <br />Continue to improve jurisdictional capabilities to prepare for, <br />respond to, mitigate, and recover from natural and technological <br />disasters. <br />Fridley City 10,000 100000 Multi-Gov Continued