Laserfiche WebLink
Anoka County Multi-Jurisdictional <br />All Hazards Mitigation Plan <br /> 267 <br /> <br />2.1.1 1 <br />Create and participate in an 800 MHz radio exercise and continue <br />exercises annually. <br />1.2.2 2 <br />Add Fire-wise, burn permits and wild fire fire information to the <br />City Website. <br />3.1.1 3 <br />Schedule and conduct Incident Command training annually for <br />all fire, EMS, rescue, city staff and law enforcement personnel <br />as needed. <br />2.1.2 4 Participate in the annual severe weather drill. <br />1.2.2 5 Fire lockbox program for commercial property. <br />1.2.1 6 Create a home address program (number visibility.) <br />3.2.2 7 Develop evacuation routes and procedures <br />2.2.1 8 <br />Complete command center/EOC area including maintain and <br />test emergency backup systems regularly. <br />3.2.3 9 Improve access to main highway at Lake Drive and I 35 <br />Action Priority <br />Coon Rapids <br />Action Project Comment <br />1.1.2 1 Build Overpass on CSAH 14 over <br />1.1.1 2 <br />Increase pedestrian and bicycle trails under or over major <br />surface streets to reduce accidents and increase safety. <br />2.1.7 3 Clean holding ponds. <br />2.1.6 4 Clean ditches waterways. <br />2.1.5 5 Enlarging culverts pipes. <br />Action Priority <br />East Bethel <br />Action Project Comment <br />4.1.2 1 Meet with property owners and review mitigation strategies <br />4.1.1 2 Identify Flood Prone Properties in the City of East Bethel <br />4.1.3 3 Implement agreed upon mitigation strategies <br />3.1.3 4 <br />Create RFP and go out for bid for building of severe weather <br />shelters. <br />3.1.2 5 Establish guidelines and adopt resolution for shelter procedures. <br />2.1.1 6 Identify appropriate generator for city facilities. <br />3.1.1 7 <br />Determine location, size and feasibility of a shelter for every city <br />park. <br />2.1.3 8 Install and test city generators on a monthly basis. <br />2.1.2 9 <br />Purchase generator and equipment for proper installation at city <br />facilities. <br />3.1.4 10 Review bids and hire contractor for shelter construction. <br />3.1.5 11 Contractor builds shelters. <br />Action Priority <br />Fridley <br />Action Project Comment <br />3.1.2 1 Continue to review warning and information systems. <br />3.1.1 2 <br />Evaluate current warning and evacuation systems and <br />determine needs. <br />2.1.4 3 Train members in the use of the equipment