Laserfiche WebLink
Anoka County Multi-Jurisdictional <br />All Hazards Mitigation Plan <br /> 269 <br /> <br />3.1.5 6 <br />Retrofit Lift Stations with adapters for North Metro-wide <br />generator use. <br />3.1.3 7 Purchase generator connection for Lexington City Hall. <br />Action Priority <br />Lino Lakes <br />Action Project Comment <br />2.1.1 1 <br />Evaluate current warning system and determine level of <br />operability. <br />3.1.1 2 <br />Determine needs and establish chemical ordinance for business <br />registration. <br />2.1.3 3 Maintenance of warning units, periodic testing. <br />1.1.2 4 Coordinate stated Firewise agencies. <br />1.1.1 5 Assess parcels to be deemed as hazard areas. <br />3.1.3 6 Maintain and update chemical database on annual basis. <br />3.1.2 7 Create and compile a business chemical database. <br />1.1.4 8 Manage Firewise project through completion. <br />2.1.2 9 Ongoing replacement of warning units. <br />1.1.3 10 Conduct Firewise clean up efforts. <br />Action Priority <br />Linwood <br />Action Project Comment <br />3.1.2 1 Educate residents on the protocol of the sirens sounding. <br />2.1.3 2 Implement lockbox Program. <br />2.1.1 3 Establish fire lockbox Guidelines. <br />2.1.4 4 Maintain lockbox Records. <br />2.1.2 5 Obtain lockbox Equipment. <br />1.1.2 6 Educate homeowners of Firewise risk. <br />1.1.1 7 Evaluate Firewise areas of risk. <br />1.1.4 8 Complete Firewise project. <br />1.1.3 9 Firewise Mitigation of hazards. <br />3.1.1 10 Purchase and Install six strategically placed warning sirens. <br />Action Priority <br />Nowthen <br />Action Project Comment <br />3.1.2 1 Update ordinances. <br />3.1.1 2 Review current ordinances. <br />2.1.1 3 Establish and prioritize criteria for access routes. <br />4.1.1 4 Purchase and install outdoor warning sirens. <br />1.1.1 5 Create and implement a fire plan. <br />2.1.2 6 Acquire access routes easements. <br />2.1.3 7 Construct access roads. <br />Action Priority <br />Oak Grove <br />Action Project Comment <br />2.1.1 1 <br />Evaluate current warning system, determine level of operability <br />and establish replacement schedule. <br />4.1.1 2 Establish criteria for lockbox program/data base