My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-12-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
06-12-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 10:21:08 AM
Creation date
9/18/2017 3:55:21 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/12/2017
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
738
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> <br />a. Obtain certified as-built contours for all ponds and inspect the ponds, <br />and associated outlet structures, culverts and outfall structures one year <br />and two years after the completion of as-builts, including measuring <br />sediment accumulation by a method accurate to within one vertical foot. <br />Thereafter, the Permittee will perform inspections in the fifth year after <br />pond completion and every five years thereafter. If inspections show that <br />sediment may accumulate to 50 percent of wet storage volume, or 25 <br />percent of dry detention volume, within less than five years, the Permittee <br />will inspect more frequently. Pond function will be considered <br />inadequate if sediment accumulation has decreased the wet storage <br />volume by 50 percent or dry detention volume by 25 percent, and the <br />Permittee will restore the basin to its original design elevations and <br />dimensions and restore vegetation in disturbed areas within one year of <br />the inspection date. <br /> <br />b. Inspect stormwater infiltration and filtration basins, including rain <br />gardens, annually, to preserve live storage capacity at or above the <br />design volume. Remove vegetation, maintain healthy plant growth and <br />remove excess sediment and debris to ensure that the facilities continue <br />to perform per design. <br /> <br />c. Inspect grit chambers, sump catch basins and sump manholes <br />annually. Accumulated sediment and debris will be removed so that the <br />each facility continues to operate as designed and erosion or structural <br />problems are corrected. <br /> <br />d. Inspect conveyances and other structures annually. Ensure <br />preservation of designed hydraulic capacity. <br /> <br />2. If the Permittee conveys into private ownership a fee interest in all or any <br />portion of the public property that is subject to this Agreement, it must require <br />as a condition of sale, and enforce: (a) that the purchaser record a declaration <br />on the property incorporating the stormwater management facility maintenance <br />requirements of this Agreement; and (b) that recordation occur either before any <br />encumbrance is recorded on the property or, if after, only as accompanied by a <br />subordination and consent executed by the encumbrance holder ensuring that <br />the declaration will run with the land in perpetuity. If the Permittee conveys into
The URL can be used to link to this page
Your browser does not support the video tag.