My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/03/1975 P&Z Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Minutes
>
1975
>
09/03/1975 P&Z Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 3:31:26 PM
Creation date
9/29/2017 2:36:37 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
09/03/1975
P&Z Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CilUJiw11ake6»q' <br />September 3, 1975 <br />464-5562 <br />4L) ,�1 <br />1189 Main Street <br />Lino Lakes, Minnesota 55014 <br />A Special Meeting of the Lino Lakes Planning and Zoning Board was called to <br />order at 8:10 P.M. by Chairman Karth. Members present: Houle, Gourley, Kelling, <br />Shearan, Nadeau and Hill. Members absent: NONE. Councilman Marier was not <br />present due to illness. <br />The purpose of this meeting is to consider a request by Glenn Rehbein to build <br />"Mini -Storage Units" on the property located at 7309 Lake Drive. <br />Mr. Dave Sina was present to represent Mr. Rehbein. <br />Mr. Karth asked the intended location of the new buildings and Mr. Sina replied <br />that they would be inbetween the original Rehbein building and the one that is <br />under construction at this time. There will be 111' between the original building <br />and the proposed storage buildings. <br />Mr. Sina said that these buildings are rented out to private parties to store whatever <br />they desire to and that there will be, no business' conducted out of these buildings. <br />Mr. Karth asked about the point that the Planner brought out in his letter, i.e. <br />the County Highway Department wishes to review the proposed access to the storage <br />building? <br />Mr. Sina said that he had talked, to the County and the State and the State says <br />they still have the right of way on Highway 8 and that they will decide what needs <br />to be done there. Rehbein will have to pay a $200.00 permit fee, the State will <br />inspect the site and decide if and where of culvert will have to be placed. <br />Mr. Hill asked if they planned on using Fourth Avenue for an access road in the <br />future? <br />Mr. Sina said they were not sure at this time - they don't know if and when Fourth <br />Avenue will be upgraded. They will make plans to have an access road put in on <br />the property in order to not land lock their own property. <br />Mr. Starr, City Planner, has sketched a proposed future access road and Mr. Sina <br />has said that they could live with that as proposed but it might not be in that <br />exact location. <br />The questions of relying on Fourth Avenue for heavy truck traffic came up and <br />Mr. Hill asked if the City has jurisdiction to put in a heavier road for this <br />one concern. <br />Mr. Karth said it may be up to the neighbors on Fourth Avenue and both would have <br />to agree to the upgrading of this road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.