My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-06-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
11-06-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2017 12:27:44 PM
Creation date
12/7/2017 12:06:14 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/06/2017
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary of comments received relating to Rice Creek Chain of Lakes Park Reserve Master Plan <br />Amendment: <br />Relating to the Park: <br />1. Add 1 bench between the entrance and the 1" turn looking out over the field and one at the <br />boat launch dock area. <br />a. Response: These bench locations will be reviewed and installed if feasible. <br />2. We need to include the importance of the historical and cultural resources in the area. <br />a. Response: The Campground Visitor Center contains information regarding the <br />significance of the history and cultural resources in the area. The County is proposing to <br />provide additional interpretive information as part of this master plan amendment. <br />3. With Waterworks finally being torn down, the unofficial boat and snowmobile access will be <br />gone. How will that affect the park? <br />a. Response: The County works with the snowmobile club on a regular basis, which <br />provides the maintenance for the snowmobile trails. The County does not anticipate <br />there to be any adverse effects to the park because of this change. The boat launch <br />may see an increase in traffic, but the launch parking lot is limited to 28 vehicle and <br />trailer stalls and 10 vehicle only stalls. <br />1. Add a fishing pier on Centerville Lake. <br />a. Response: This has been incorporated into the development concept of the master plan <br />amendment. <br />2. Add a longer fishing pier at Peltier. <br />a. Response: The County is currently in the process of procuring and installing a 104 feet <br />long pier. This will be the longest pier in our system and the longest that we can <br />purchase from the vendor. Due to maintenance challenges, 104 feet is our maximum <br />length. <br />3. Upgrade the marketing info within the park. Create a kiosk of some sort to promote the <br />programs at Wargo. <br />a. Response: Going forward, the County is planning on implementing digital monitors in <br />indoor and covered locations throughout the park system to provide relevant, up-to- <br />date information for our patrons. <br />4. Trim/remove the trees for ease of seeing the park entrance sign. <br />a. Response: The vegetation at all vehicular entrances will be reviewed and trimmed if <br />necessary. <br />5. Aqua Lane needs to be addressed. <br />a. Response: The County is anticipating receiving funds to address the issues related to <br />Aqua Lane in 2018/19. <br />6. Add a Micro -brewery <br />a. Response: While the County understands the desire of micro -breweries, a micro - <br />brewery is not considered a compatible use for a regional facility and does not meet an <br />outdoor recreational need in the system. Refer to Minn Stat. 473.147, Subd. 1 and Minn. <br />Stat. 473.121, Subd. 14. <br />7. Add horse trails wide enough for two people to ride side by side <br />
The URL can be used to link to this page
Your browser does not support the video tag.