My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-06-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
11-06-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2017 12:27:44 PM
Creation date
12/7/2017 12:06:14 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/06/2017
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.2.3 Additional BMPs for Consideration of Future Development <br />Additional onsite water quality practices will be encouraged as part of future development, and as part of <br />the Lino Lakes AUAR requirements. The following may be considered, if feasible: <br />• Stormwater reuse for irrigation — initial estimates indicate that up to 36 acre-feet of stormwater <br />could be used for irrigation purposes over public open spaces, however the actual amount of <br />volume infiltrated will be defined based on RCWD Rule C.6 <br />• Soil amendments — consistent with the RCWD Soil Amendment Guidelines <br />• Small-scale BMPs such as tree trenches, raingardens, cisterns, etc. <br />• Mechanical separators <br />• Media filtration to improve water quality <br />6.3 Peak Stormwater Runoff Control [RCWD Rule C.7] <br />All stormwater runoff from the area either surface flows directly to Peltier Lake or is conveyed to the lake <br />via the county ditch system (Figure 1, Appendix A). As discussed in Sections 3 and 5, InfoSWMM and <br />HEC -RAS models were developed to evaluate the existing discharge rates entering Peltier Lake. The <br />proposed land uses will result in more impervious surface and higher runoff rates and volumes leaving <br />the CSMP study area and entering Peltier Lake. The regional BMPs will include outlet control structures <br />to regulate the flood releases from the BMPs so they do not impact flood levels on Peltier Lake. <br />6.3.1 Allowable Peak Discharges <br />Per RCWD Rule C.7, the proposed discharge rates are limited to the existing discharge rates from a site; <br />however, because this area has been identified as a Runoff Sensitive Area, the City will impose a <br />restriction of 0.1 cfs per acre on new private developments for the 100 -year peak discharge rate, which is <br />also the same rate requirement the City of Hugo implemented in 2003 as part of their Comprehensive <br />Stormwater Management Plan. This will result in a maximum peak discharge rate from the CSMP area <br />into Peltier Lake of no more than 135 cfs. <br />Table 6-3. Northeast Lino CSMP Allowable Peak Discharge Rates <br />Storm Event <br />Rainfall Depth Discharge to Peltier Lake <br />[in] [cfs] <br />2 -year 24-hour <br />2.83 <br />68 <br />10 -year 24-hour <br />4.21 <br />133 <br />100 -year 24-hour <br />7.06 <br />135 <br />100 -year 10 -day <br />7.20 <br />135 <br />Future development in the CSMP area must not exceed the NOAA Atlas 14 permitted rates to Peltier <br />Lake, as shown in Table 6-3. <br />6.3.2 Flood Control Storage <br />To meet the proposed discharge rates, a significant amount of land is needed to provide live storage for <br />flood control. As part of the City's land use practices, the existing wetlands are intended to remain in <br />place where possible and will provide some incidental flood storage capacity. Table 6-4 shows the live <br />storage assumed for flood reduction used in the modeling. <br />Comprehensive Stormwater Management Plan <br />Northeast Lino Lakes Drainage Improvement Project <br />WSB Project No. 2929-79 <br />Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.