My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-06-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
11-06-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2017 12:27:44 PM
Creation date
12/7/2017 12:06:14 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/06/2017
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rice Creek Chain of Lakes Park Reserve Rice Creek Chain of Lakes Park Reserve <br />additional benches, picnic tables and other site furnishings as needed throughout the park for the convenience <br />of park patrons. <br />In an effort to update marketing strategies within the park, the County is proposing to implement digital <br />monitors for indoor and covered locations throughout the park system to provide relevant, up-to-date materials <br />for our patrons. This makes changing/updating <br />the materials easy and more efficient. <br />The total development cost for the projects <br />outlined in this Master Plan Amendment are <br />approximately $10,725,000. <br />Conceptual Development Costs Summary <br />Wargo Nature Center <br />Improvements <br />$ 7,000,000 <br />Maintenance Facility Improvements <br />1,950,000 <br />Park Improvements <br />1,775,000 <br />Total <br />$ 10,725,000 <br />CONFLICTS <br />Conflicts related to the park development will be kept to a minimum through the proper planning and <br />community engagement. See additional information regarding engagement in the Public Engagement and <br />Participation section of this document. <br />The greatest potential for conflict related to the proposed projects are the archaeological resources in the area. <br />The park is within a well-known archaeological area and therefore every care will be taken to ensure those <br />conflicts will be minimized. An archaeological survey will be conducted prior to any project being constructed. <br />If resources are found, some previously used strategies could be implemented within the project sites. One of <br />the strategies may be "cap" the site and not excavate down, but rather build up and over the site. This removes <br />disturbance to the site and provides preservation of the cultural resource. Other mitigation techniques used in <br />the past have included the excavation and curation of found artifacts or avoidance. <br />There are no conflicts anticipated with any of the surrounding land uses, which is mostly residential. Refer to <br />the Appendix for the planned land uses in the area. The greatest conflict arises in relation to the burial mound <br />interpretive site and because we are aware of the potential for conflict, the County will be cautious in designing <br />and constructing this area to avoid impacts to the mound. The County will also work with members of the local <br />Dakota community to ensure the plans and design of the interpretive node are respectful of the culture and <br />traditions of the Dakota people. <br />Conflicts between pedestrians and vehicular traffic will be kept to a minimum by reducing the number of trail <br />and road crossings within the park and by working with the local cities and the County Highway Department to <br />ensure safe crossings at road intersections. Treatments for these areas may include signing, striping and <br />signalized pedestrian crossings. In addition, signs within the park will alert users of potential conflict areas, i.e. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.