Laserfiche WebLink
.� .A.9. Walk WadeMPP' <br />CHP /ELI <br />Combustion Heat & Power <br />Mechanical & Electrical Services A Division of NAC <br />1001 Labore Industrial Court, Suite B Vadnais Heights, Minnesota 55110 tel: 651-490-9868 fax: 651-490-1636 <br />August 22, 2017 <br />Mr. Tim Hillesheim <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes MN 55014-1182 <br />Re: Lino Lakes Automation Integration and Upgrade <br />Mr. Hillesheim <br />Current Situation: The city of Lino Lakes currently utilizes Johnson Metasys Automation to control <br />the main air handling equipment and HVAC system in the City Hall, Early Learning Center, and <br />Police Station. As of June 30, 2015, Johnson Controls discontinued the manufacturing and sales of <br />these controllers (see attached bulletin from Johnson). The remainder of the individual vav and <br />thermostats that make up the building controls are using pneumatics (air) automation, which at the <br />time of installation was a practice not widely used anymore. The pneumatics are not currently and <br />cannot be interfaced with today's automation controls and have to run as a basic unintelligent <br />system that cannot adapt to today's changing interior climates and needs. As interior heat and <br />cooling loads change and the amount of fresh air requirements change per codes, pneumatics <br />cannot change with these needs. <br />Pneumatics is less efficient than electronic controls and require constant service to maintain and <br />operate the system as efficiently as possible. Preventative maintenance is crucial and time <br />consuming for a pneumatic control system as a controller can fall out of calibration within a 4-8 <br />month period and should be calibrated at minimum 2 times per year. Pneumatic controls also <br />require the use of an air compressor and air drier to supply the correct air pressure with minimum <br />moisture circulation in the pneumatic lines. This added equipment requires preventive <br />maintenance and yearly replacement of air & oil filters, oil changes and belts to keep the system <br />running at peak performance. <br />Currently the city hall office wing has had conversion of VAV's to Alerton automation as the existing <br />pneumatics have failed and the new fire station #2 has full Alerton building automation. The City <br />currently owns the Alerton automation software and by extending this existing infrastructure this <br />can be a very cost effective way to replace the failing pneumatics and legacy Johnson system. Some <br />Advantages to extension of the Alerton automation are the city staff is familiar with the software <br />and operations and the integration between Fire Station#2 and City Hall would allow the Lino <br />Lakes Maintenance staff to monitor and view any city site with Alerton from anywhere in the city or <br />at home for afterhours calls or monitoring. <br />wwM'.nac-hvac.com, 24 Hour Service <br />An Affirmative Action, Equal Employment Opportunity Employer <br />Direct (651) 255-3527 Fax (651) 490-1636 Cell (651) 230-8971 Email skotzmacher@nac-hvac.com <br />HVAC Mechanical - Building Automation - Electrical - Plumbing - Sheet Metal - Preventative Maintenance - Service Repairs - Combustion Services - Communications <br />