Laserfiche WebLink
Cost Estimate <br />The preliminary cost estimate shows a total redevelopment cost of approximately <br />$6.0 million (2015 dollars) to implement all proposed improvements. Near term <br />phase redevelopment is estimated at $2.4 million; mid-term phase at $1.2 million; <br />and long-term phase at $2.4 million. These figures include contingencies for <br />construction and engineering. <br />FIGURE 5.1 Cost Estimate <br />54 Chapter 5: Implementation <br />Wargo Nature Center <br />Hugo, Minnesota <br />03.11.15 <br />Preliminary Schematic Cost Estimate: based on MasterPlan <br />Prepared by Hoisington Koegler Group Inc. <br />Description <br />Qty. <br />Unit <br />Unit price <br />Totals <br />with 3096 escalation <br />Subtotals <br />Near term <br />Mid term <br />Longterm <br />A <br />CIRCULATION <br />Entry Walk +Node <br />8' permeable path <br />355 <br />If <br />$ 120 <br />$ 42,600.00 <br />$55,380 <br />$ 55,380.00 <br />bicycle parking and entry plaza permeable paving <br />1000 <br />sf <br />$ 15 <br />$ 15,000.00 <br />519,500 <br />$ 19,500.00 <br />Bike hoops <br />4 <br />ea <br />$ 300 <br />$ 1,200.00 <br />51,560 <br />$ 1,560.00 <br />plantings/landscaping (9 x 125 sf areas) <br />1125 <br />sf <br />$ 10 <br />$ 11,250.00 <br />514,625 <br />$ 14,625.00 <br />seating + gathering area <br />2 <br />ea <br />$ 2,500 <br />$ 5,000.00 <br />$6,500 <br />$ 6,500.00 <br />ADA Loop <br />Paved bituminous or limestone ADA trail to water station 28'0890' <br />890 <br />If <br />$ 35 <br />$ 31,150.00 <br />540,495 <br />$ 40,495.00 <br />Paved bituminous or limestone ADA trail 8'51620' <br />1620 <br />If <br />$ 35 <br />$ 56,700.00 <br />573,710 <br />$ 73,710.00 <br />Paved bituminous service drive 10' x 230' <br />230 <br />If <br />$ 50 <br />$ 11,500.00 <br />514,950 <br />$ 14,950.00 <br />Paved bituminous ADA trail to main dock l0x360' <br />360 <br />If <br />$ 45 <br />$ 16,200.00 <br />$21,060 <br />$ 21,060.00 <br />Wayfrnding/Interpretation/Signage <br />Main entrance sign <br />1 <br />ea <br />$ 5,000 <br />$ 5,000.00 <br />56,500 <br />$ 6,500.00 <br />Site welcome sign/directional <br />1 <br />ea <br />$ 2,500 <br />$ 2,500.00 <br />53,250 <br />$ 3,250.00 <br />Site orientation sign/wayfindingat entry node <br />1 <br />ea <br />$ 300 <br />$ 300.00 <br />5390 <br />$ 390.00 <br />mist. interpretive signage (compost, prairie, forest restoration/invasives) <br />3 <br />ea <br />$ 800 <br />$ 2,400.00 <br />53,120 <br />$ 3,120.00 <br />Miscellaneous wayfnding <br />7 <br />ea <br />$ 500 <br />$ 3,500.00 <br />54,550 <br />$ 4,550.00 <br />Heritage Lab entrance signage <br />1 <br />ea <br />$ 1,000 <br />$ 1,000.00 <br />51,300 <br />$ 1,300.00 <br />Heritage Lab wayfinding sign <br />1 <br />ea <br />$ 500 <br />$ 500.00 <br />5650 <br />$ 650.00 <br />subtotal <br />$267,540 <br />$ 267,540.00 <br />C <br />PLAZA IMPROVEMENTS + SITE <br />Bioswale/Dry Stream <br />300 <br />SF <br />$ 20 <br />$ 6,000.00 <br />57,800 <br />57,800 <br />Plaza/Rear Circulation <br />Permeable pavers <br />2000 <br />sf <br />$ 15 <br />$ 30,000.00 <br />039,000 <br />539,000 <br />Landscape allowance <br />1 <br />EA <br />$ 2,500 <br />$ 2,500.00 <br />$3,250 <br />$3,250 <br />subtotal <br />$50,050 <br />$ 50,050.00 <br />D NATURE PLAY AREA IMPROVEMENTS <br />New Entrance <br />woodchip path (4' x 55' path ) <br />55 <br />LF <br />$ 5 <br />$ 275.00 <br />3358 <br />$ 35750 <br />oncrete stairs (4' wide with 12 stairs) <br />0 <br />LS <br />$ 115,000 <br />$ - <br />$ - <br />limber stairs (4'wide, l2steps) <br />12 <br />ea <br />$ 2,500 <br />$ 30,000.00 <br />539,000 <br />$ 39,000.00 <br />Signature Feature <br />new nature play/discovery element <br />1 <br />ea <br />$ 35,000 <br />$ 35,000.00 <br />$45,500 <br />$ 45,500.00 <br />Landscaping Allowance <br />$ - <br />selectivetreeclearing(ash) <br />1 <br />L5 <br />$ 2,000 <br />$ 2,000.00 <br />$2,600 <br />$ 2,600.00 <br />woodchip trails <br />1 <br />LS <br />$ 1,000 <br />$ 1,000.00 <br />$1,300 <br />5 1,300.00 <br />understory tree planting <br />20 <br />EA <br />$ 200 <br />$ 4,000.00 <br />55,200 <br />5 5,200.00 <br />sledding hill clearance and landscaping <br />.6 <br />ac <br />$ 4,000 <br />$ 2,400.00 <br />33,120 <br />$ 3,120.00 <br />Restoration/invasive species control <br />.5 <br />ac <br />$ 3,000 <br />$ 1,500.00 <br />01,950 <br />$ 1,950.00 <br />Picnic table <br />5 <br />EA <br />$ 1,500 <br />$ 7,500.00 <br />59,750 <br />5 9,750.00 <br />subtotal <br />$108,778 <br />$ 108,777.50 <br />MIL <br />EQUIPMENT STORAGE RELOCATION <br />new structure (200 sf) <br />1 <br />LS <br />$ 10,000 <br />$ 10,000.00 <br />$13,000 <br />$ 13,000.00 <br />covered boat storage 30'x 18' <br />1 <br />15 <br />$ 20,000 <br />$ 20,000.00 <br />526,000 <br />$ 26,000.00 <br />canoe racks <br />3 <br />ea <br />$ 1,000 <br />$ 3,000.00 <br />$3,900 <br />$ 3,900.00 <br />subtotal <br />542,900 <br />$ 42,900.00 <br />Mr <br />BUILDING MODIFICATIONS <br />InteriorSpace reconfiguration (main and lower level, MEP) <br />1 <br />LS <br />0 352,788 <br />5 352,788.00 <br />$458,624 <br />$458,624 <br />Treehouse addition <br />1 <br />LS <br />$ 136,477 <br />$ 136,477.00 <br />5177,420 <br />$177,420 <br />Front Entrance <br />1 <br />LS <br />$ 31,866 <br />5 31,866.00 <br />$41,426 <br />$41,426 <br />Indoor interpretation <br />1 <br />1_5 <br />$ 105,000 <br />$ 105,000.00 <br />5136,500 <br />5136,500 <br />subtotal <br />5813,970 <br />$ 813,970.30 <br />TRAIL CONNECTIONS <br />Connection to Prairie <br />East Boardwalk 8' 01200'(1200 LF) <br />1200 <br />If <br />$ 175 <br />$ 210,000.00 <br />$273,000 <br />3273,000 <br />West Boardwalk 8' x 2000' <br />If <br />$ 175 <br />$ - <br />$ <br />Connection to YMCA <br />Boardwalk 10'x 3,540' <br />3,540 <br />If <br />$ 175 <br />$ 619,500.00 <br />$805,350 <br />$805,350 <br />Paved bituminous trail 10'03,400' <br />3,400 <br />If <br />$ 80 <br />$ 272,000.00 <br />$353,600 <br />$353,600 <br />Repaving entry drive 4210'e24'(includes base material, prep, mobilization and <br />101040 <br />sf <br />$ 3 <br />$ 328,380.00 <br />$426,894 <br />$ 426,894.00 <br />Upland natural surface trail loop <br />1500 <br />If <br />$ 2 <br />$ 3,000.00 <br />$3,900 <br />$3,900 <br />subtotal <br />$1,862,744 <br />$ 426,894.00 <br />$ 3,900.00 <br />$ 1,431,950.00 <br />54 Chapter 5: Implementation <br />