Laserfiche WebLink
good and accepted engineering practices, and which must not interfere with <br />Owner's use of the water tower. <br />(iii) In the event of an emergency power outage, and for the duration of such <br />outage, Tenant may install a temporary portable generator to be located adjacent <br />to the communications water tower. The fuel tank for the generator is self- <br />contained (gasoline or diesel) and must be used in accordance with all applicable <br />fire and health codes. <br />(iv) Related support equipment for six (6) panel antennas, and nine (9) RRUs, <br />including base station and related equipment on the raised platform in the base of <br />the water tower. <br />The equipment listed in this paragraph is collectively referred to as the "Equipment." <br />4. Equipment Installation. Owner approves the installation of the Equipment as placed <br />on the Effective Date of this Agreement. Tenant's subsequent installation and/or maintenance of <br />such Equipment must be done according to plans approved by Owner's engineering consultant <br />(the "Engineer") and inspected by the Engineer or an agent selected by the Engineer, which <br />approval will not be unreasonably withheld, conditioned or delayed. Tenant will be responsible <br />for the cost of the inspection. Such cost will be reimbursed to Owner within thirty (30) days <br />following receipt of an invoice together with reasonable supporting documentation evidencing <br />such cost. Any damage done to the Leased Property, Owner's Property, and/or water tower itself <br />by Tenant or its employees or agents, save normal wear and tear, during installation and/or <br />during operation, must be repaired or replaced within thirty (30) days after written notification <br />by the Engineer, at Tenant's expense, and to the Engineer's reasonable satisfaction. All work <br />performed on the water tower must be constructed according to applicable federal, state and local <br />3 <br />