My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03-14-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
03-14-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 11:47:06 AM
Creation date
3/14/2018 11:37:54 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/01/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> Engineering Planning Environmental Construction 701 Xenia Avenue South <br /> Suite 300 <br /> Minneapolis, MN 55416 <br /> Tel: 763-541-4800 <br /> Fax: 763-541-1700 <br /> <br /> <br />Minneapolis St. Cloud <br /> Equal Opportunity Employer <br /> <br /> <br /> <br /> <br />February 18, 2106 <br /> <br />City of Lino Lakes <br />Mr. Michael Grochala <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br /> <br /> <br />Re: 2016 Street Maintenance Project <br /> Civil Engineering Design Services <br /> <br /> <br />Dear Mr. Grochala: <br /> <br />We appreciate the opportunity to provide this proposal for civil engineering design services. The <br />City of Lino Lakes is requesting assistance with design of its 2016 Street Maintenance Project. <br />The streets designated for rehabilitation are local streets as determined by their OCI ratings <br />established in the City’s Pavement Management Study. This proposal has been broken out for <br />each site. <br /> <br />Holly Lane – Full Depth Reclamation <br /> <br />The scope of services includes the preparation of construction documents for full depth <br />reclamation of Holly Lane from, Ash Street to Holly Court (approximately 0.67 miles). Our <br />design services include survey of existing conditions, preparation of construction plans, <br />preparation of a project manual (specifications) and assistance with project bidding. The <br />engineering fee to complete the described design services above is $12,500. <br /> <br />Holly Court – Mill and Overlay <br /> <br />The scope of services includes the preparation of construction documents for mill and overlay of <br />Holly Court from Holly Lane to the existing cul de sac located approximately 0.30 miles east of <br />Holly Lane. Our design services include survey of existing conditions, preparation of <br />construction plans, preparation of a project manual (specifications) and assistance with project <br />bidding. The engineering fee to complete the described design services above is $6,200. <br /> <br />Birch Street – Mill and Overlay <br /> <br />The scope of services includes the preparation of construction documents for mill and overlay of <br />Birch Street from Pheasant Run South (Saddle Club) north to the proposed cul de sac located at <br />CSAH No. 34 (approximately 0.25 miles). Our design services include survey of existing
The URL can be used to link to this page
Your browser does not support the video tag.