Laserfiche WebLink
Ms. Katie Larsen <br />August 31, 2016 <br />Page 2 <br /> <br /> <br /> \\mspfsv02.lps.local\Studios\Active Projects\CLL16008 - Woods Edge Final PUD and Final Plat\From Others (Original <br />Data)\083016 Engineering Review Lino Lakes Woods Edge.docx <br /> <br />WATER SYSTEM <br /> <br />1. Add a note to the existing notes, to use 8’x8’x4” insulation at pipe crossings when there <br />is less than 24” vertical clearance between the watermain and sewer. <br /> <br />SANITARY SEWER SYSTEM <br /> <br />1. Collecting 98 units would still be satisfactory for the capacity of the lift station. Either <br />proposed configuration of the sanitary sewer system previously identified in that area is <br />acceptable. If the applicant changes the sanitary design they will need to re-submit plans <br />for review. <br /> <br />STORM SEWER SYSTEM <br /> <br />1. No Comments <br /> <br />DEVELOPMENT AGREEMENT <br /> <br />1. Required with final plat. <br /> <br />PERMITS <br /> <br />1. No Comments <br /> <br /> <br />If you or the applicant has any questions regarding these comments, please contact Diane <br />Hankee at (651) 982-2430 or diane.hankee@ci.lino-lakes.mn.us. <br /> <br />