Laserfiche WebLink
Ms. Katie Larsen <br />August 2, 2016 <br />Page 3 <br /> <br /> <br /> K:\02988-280\Admin\Docs\Plan Review - Preliminary Plat <br /> <br />FLOODPLAIN <br /> <br />1. No comments. <br /> <br />WETLANDS <br /> <br />Rice Creek Watershed District is the LGU to review and approve the wetland delineation. Thus <br />we have not reviewed for the Wetland Conservation Act (WCA). <br /> <br />1. Provided the LGU approves the wetland delineation, there are no proposed wetland <br />impacts. Therefore, no wetland mitigation approval is needed. <br /> <br />ENVIRONMENTAL <br /> <br />1. No comments. <br /> <br />TRANSPORTATION <br /> <br />1. The right of way along White Pine Road should be extended to 40 ft as this is classified <br />as a collector street. <br /> <br />WATER SYSTEM <br /> <br />1. Update ‘Water Main Notes’ note 2 to the following verbiage: Maintain 24-inch minimum <br />vertical clearance between sewer and water main crossings. Maintain 10-foot horizontal <br />clearance between water main and sewer. <br /> <br />2. Revise note for scenario where curb stops fall in driveways to read ‘Where curb stops fall <br />in driveway, provide Ford A1 type casting. <br /> <br />SANITARY SEWER SYSTEM <br /> <br />1. Add ‘Sanitary Sewer Notes’ note 2 that contractor shall provide X, Y and Z GPS <br />coordinates of wye and service end. <br /> <br />STORM SEWER SYSTEM <br /> <br />1. All storm sewer shall be reinforced concrete pipe. <br /> <br />2. Proposed storm sewer does not meet minimum grade requirements for flushing (3 fps). <br /> <br />3. Proposed storm sewer does not meet minimum cover requirements (2 ft). <br /> <br />4. Add ‘Storm Sewer Notes’ note 3 to include the following verbiage: All joints to be <br />wrapped with geotextile fabric (STR-11). <br />