Laserfiche WebLink
St. Clair Estates <br />Development Agreement <br />February 27, 2017 <br /> page 3 <br />iv. The Developer’s engineer shall certify in writing, with an as-built survey, <br />that all grading complies with the approved grading plan prior to <br />issuance of any building permits. <br />v. The Developer shall promptly clear dirt and debris within public right-of- <br />ways and drainage and utility easements resulting from construction by <br />the Developer, its purchasers, builders and contractors within five (5) <br />days after notification by the City. The Developer shall be responsible for <br />all necessary street and storm sewer maintenance, including street <br />sweeping, until all home construction is completed, unless otherwise <br />released by the City. Warning signs shall be placed when hazards <br />develop in streets to prevent the public from traveling on them, <br />including detour signs if necessary. If and when the streets become <br />impassable, such streets shall be barricaded and closed. The Developer <br />shall maintain a smooth, hard driving surface and adequate drainage on <br />all temporary streets. <br />c. Final street grading, subbase, gravel base, concrete curb and gutter, and <br />bituminous base course and wear course shall be furnished and installed. <br />d. Sidewalks, paths and street lighting as required by the City. <br />e. Storm sewers, when determined to be necessary by the City Engineer, including <br />all necessary laterals, catch basins, inlets and other appurtenances, shall be <br />furnished and installed. <br />f. Sanitary sewer mains, laterals or extensions, including all necessary building <br />services and other appurtenances, shall be furnished and installed. <br />g. Water mains, laterals or extensions, including all necessary building services, <br />hydrants, valves and other appurtenances, shall be furnished and installed. <br />h. The Developer shall place iron monuments at all lot and block corners and at all <br />other angle points on boundary lines. Iron monuments shall be placed after all <br />street and lawn grading has been completed in order to preserve the lot <br />markers for future property owners. Lot corner irons on the back property line <br />shall be installed so that the top of the iron corresponds to the finished ground <br />elevation in accordance with the approved grading plan. Guard stakes shall be <br />appropriately installed to mark these irons. <br />i. Landscaping shall be furnished and installed in accordance with the approved <br />plans.