<br /> Bald Eagle Erectors Site Performance Agreement page 2 of 8 <br />approval, such as, but not limited to: landscaping, private driveways, <br />parking areas, sanitary sewer extension, water system extension, storm <br />drainage systems, curbing, lighting, fencing, fire lanes, sidewalks, exterior <br />building architectural design and building elements, site grading and <br />erosion control measures. <br /> <br />Such improvements shall be completed in accordance with Section IV <br />herein. <br /> <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On-Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be reviewed <br />by the City, and the City shall establish the actual amount of the financial <br />guarantee. The description and estimated cost of Developer's On-site <br />Work are as follows: <br /> <br /> Description of Improvements Estimated Costs <br /> <br />1. Grading & Utility Improvements $120,000 <br />2. Bituminous Paving $200,000 <br />3. Concrete Paving $30,000 <br />4. Fence $25,000 <br />5. Erosion Control $50,000 <br />6. Landscaping $60,000 <br /> Total Estimated Cost of Developer <br />Improvements <br /> <br />$485,000 <br /> Security Requirement (Total * 35%) $169,750 <br /> <br />III. RECORD DRAWINGS <br /> <br />A record drawing that includes an as-built survey of grading, storm water <br />BMP’s (ponds, rain gardens, trenches, swales, etc.) is to be submitted to <br />the City for verification of compliance with the approved plans. A hard <br />copy and an electronic copy of the record drawing must be submitted. <br /> <br />IV. COMPLETION DATE. <br /> <br />If the activities authorized by site and building plan approval are not initiated <br />within twelve (12) months from the final execution of this agreement, then <br />Developer will need to start the site and building plan approval process from <br />the beginning. <br />