My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-24-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
04-24-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 12:48:20 PM
Creation date
3/14/2018 12:10:49 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/24/2017
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
American Legion Post 566 Site Performance Agreement page 2 of 8 <br /> <br />Such improvements shall be completed in accordance with Section IV <br />herein. <br /> <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On-Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be reviewed <br />by the City, and the City shall establish the actual amount of the financial <br />guarantee. The description and estimated cost of Developer's On-site <br />Work are as follows: <br /> <br /> Description of Improvements Estimated Costs <br /> <br />1. Storm Sewer & Storm Water Management $5,930 <br />2. Bituminous & Concrete Paving $54,325 <br />3. Grading & Erosion Control $11,000 <br /> Total Estimated Cost of Developer <br />Improvements <br /> <br />$71,255 <br /> Security Requirement (Total * 35%) $24,940 <br /> <br />III. RECORD DRAWINGS <br /> <br />A record drawing that includes an as-built survey of grading, storm water <br />BMP’s (ponds, rain gardens, trenches, swales, etc.) is to be submitted to <br />the City for verification of compliance with the approved plans. A hard <br />copy and an electronic copy of the record drawing must be submitted. <br /> <br />IV. COMPLETION DATE. <br /> <br />If the activities authorized by site and building plan approval are not initiated <br />within twelve (12) months from the final execution of this agreement, then <br />Developer will need to start the site and building plan approval process from <br />the beginning. <br /> <br />V. GUARANTEE. <br /> <br />A. The Developer will fully and faithfully comply with all terms and <br />conditions of any and all contracts entered into by the Developer. <br />Concurrently with the execution hereof by the Developer, the Developer <br />will furnish to, and at all times thereafter maintain with the City, a cash <br />deposit, certified check, or Irrevocable Letter of Credit, based on thirty- <br />five (35%) percent of the total estimated cost of Developer's On-site <br />Work. An Irrevocable Letter of Credit shall be for the exclusive use and <br />benefit of the City of Lino Lakes and shall state thereon that the same is
The URL can be used to link to this page
Your browser does not support the video tag.