My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-22-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
05-22-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 12:49:48 PM
Creation date
3/14/2018 12:11:19 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/22/2017
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northpointe Park Development <br />City of Lino Lakes, Minnesota Page - 1 of 3 <br />No.Mat. <br />No.Item Description Quantity Units Unit Price Total Price Unit Price Total Price <br />BASE BID SCHEDULE <br />GENERAL REMOVALS AND SITE WORK <br />1 MOBILIZATION & TRAFFIC CONTROL (NOT TO <br />EXCEED 5% OF PROJECT VALUE)1 LUMP SUM $12,469.20 $12,469.20 $11,400.00 $11,400.00 <br />2 GENERAL EARTHWORK/SUBGRADE PREP 1 LUMP SUM $50,000.00 $50,000.00 $20,800.00 $20,800.00 <br />3 WATER 20 MGAL $50.00 $1,000.00 $25.00 $500.00 <br />4 IMPORT AND PLACE COMMON BORROW (LV)1,800 CU YD $8.00 $14,400.00 $21.50 $38,700.00 <br />5 IMPORT AND PLACE SELECT GRANULAR BORROW <br />(CV)150 CU YD $30.00 $4,500.00 $26.60 $3,990.00 <br />6 GEOTEXTILE FABRIC TYPE V 700 SQ YD $2.50 $1,750.00 $2.25 $1,575.00 <br />UTILITIES <br />7 ELECTRICAL WORK 1 LUMP SUM $16,000.00 $16,000.00 $13,260.00 $13,260.00 <br />8 4" PERFORATED DRAINTILE IN ROCK TRENCH 670 LIN FT $20.00 $13,400.00 $13.75 $9,212.50 <br />9 4" NON-PERFORATED PVC PIPE 100 LIN FT $20.00 $2,000.00 $16.25 $1,625.00 <br />10 CORE DRILL CONNECTION INTO TURF CB 1 LUMP SUM $800.00 $800.00 $850.00 $850.00 <br />11 DRAINTILE CLEANOUT 13 EACH $200.00 $2,600.00 $350.00 $4,550.00 <br />PAVEMENT AND SITE IMPROVEMENTS <br />12 BASKETBALL BITUMINOUS PAVING (RAP-FREE) WITH <br />AGGREGATE CLASS 5 BASE 406 SQ YD $35.00 $14,210.00 $33.65 $13,661.90 <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />I hereby certify that this is an exact reproduction of bids received. <br />Landscape Architect: Candace Amberg <br />ESTIMATE <br />SUNRAM <br />CONSTRUCTION INC. <br />BID TABULATION <br />NORTHPOINTE PARK DEVELOPMENT PROJECT <br />WSB PROJECT NO. 2988-250 <br />Opening Time: 10:00 a.m. <br />Opening Date: May 10, 2017
The URL can be used to link to this page
Your browser does not support the video tag.