Laserfiche WebLink
1 <br /> <br />WS – Item #1 <br />WORK SESSION STAFF REPORT <br />Work Session Item No. 1 <br /> <br /> <br />Date: June 26, 2017 <br /> <br />To: City Council <br /> <br />From: Michael Grochala, Community Development Director <br /> <br />Re: Watermark Development Update <br /> <br />Background <br /> <br />Mattamy Minneapolis, LLC, received PUD Development Stage Plan/Preliminary Plat <br />approval in June of 2016 (Resolution No.16-51) for the proposed Watermark residential <br />development. The proposed development is a master planned residential community <br />located in the northwest quadrant of I-35E and CSAH 14/Main Street. It contains 12 <br />parcels totaling approximately 372 gross acres and consisted of a residential mix of 706 <br />single family lots and 165 townhome units totaling 871 housing units. <br /> <br />In February of 2017 the City was informed that Mattamy Homes was moving out of the <br />Minnesota housing market and selling off its existing land holdings, including the Lino <br />Lakes site. In April of 2017, following a request from Mattamy, the City Council <br />approved a six (6) month extension for the submittal of the PUD Final Plan/Final Plat for <br />the development. <br /> <br />Mattamy has since been working on a potential sale of the development to Lennar. <br />Lennar is a leading home builder in the Twin Cities and nationally. As part of its <br />consideration Lennar is proposing an amendment to the PUD to modify lot sizes to adjust <br />to their available product types. The proposed changes include: <br /> <br />• Elimination of the 44’ wide lots and addition of 60’ wide lots product. The 55, 65’ <br />and 75’ lots previously approved would remain throughout the development. <br />• Slight reconfiguration of the townhome area and addition of a 2nd TH product <br />type. <br />• Introduction of a “Villa” product geared toward the empty nester with single level <br />living. <br />• Increase in total number of units from 871 to 896. <br /> <br />Lennar is proposing to begin construction of Phase 1 at the south end of the site, along <br />the 21st Avenue extension, in the fall of 2017. Phase 1 would consist of approximately 20 <br />Townhomes and 10 single family detached homes. Development of the park area would <br />be moved to a future phase. <br />