My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-14-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
08-14-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 2:03:05 PM
Creation date
3/14/2018 12:14:05 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/14/2017
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Lino Lakes – West Shadow Lake & LaMotte Street & Utility Improvement Projects – Proposal for Final Design <br />August 4, 2017 <br />Page 9 <br /> <br />K:\02988-450\Admin\Contract\Final Design - Proposal\2017-07-12 LL Shadow Lks & LaMotte - Proposal for Final Design - Final.docx <br /> <br />A copy of the project task hour budget is attached for your reference. Based on the proposed <br />task hour budget, WSB will complete the scope of work for both projects discussed herein on <br />hourly basis for a not-to-exceed amount of $506,220. The proposed construction cost with <br />contingency was estimated to be $5,896,224. <br /> <br />Summary of each project phase: <br /> <br /> <br />It is important to note that initial estimates for subconsultant costs for the cultural resources <br />review and title work in the amount of $9,500 were included in the engineering fees above. The <br />fees above assume that only the culvert replacement component of the project will be bid as a <br />separate project; the remaining street and utility work for both West Shadow Lake and the <br />LaMotte area will be bid as one project. <br /> <br />Task Summary Hours <br /> Standard <br />Base Fee <br />Non‐Standard <br />Fee <br />Preliminary Design & Survey 447 60,817$ <br />Well & Septic System Survey 142 15,160$ <br />Sump Pump Investigation 132 14,070$ <br />ROW/Easement Review 12 1,856$ <br />Geotechnical Borings & Evaluation 46 8,042$ <br />Cultural Resource Review (Subconsultant) 6,000$ <br />Sub‐Total ‐ Phase 1 779 60,817$ 45,128$ <br />Roadway & Drainage 958 107,167$ <br />Stormwater Lift Station 264 27,720$ <br />ROW/Easement Acquisition 264 38,132$ <br />Title Work (Subconsultant) 3,500$ <br />Water & Sewer 329 37,375$ ‐$ <br />Culvert Replacement 243 30,268$ ‐$ <br />Roadway, Drainage, Sewer 445 49,767$ ‐$ <br />Sub‐Total ‐ Phase 2 2,502 224,576$ 69,352$ <br />Culvert Replacement 319 35,722$ ‐$ <br />Street, Drainage, & Utilities 567 70,624$ ‐$ <br />Sub‐Total ‐ Phase 3 886 106,347$ ‐$ <br />Total 4,167 391,740$ 114,480$ <br />Grand Total (Both Projects) 506,220$ <br />Phase 2 ‐ Final Design & Permitting <br />Phase 3 ‐ Construction Documents & Bidding Process <br />City of Lino Lakes ‐ Engineering Services Summary <br />Total <br />Phase 1 ‐ Preliminary Design & Data Collection
The URL can be used to link to this page
Your browser does not support the video tag.