Laserfiche WebLink
City of Lino Lakes <br />August 16, 2017 <br />Page 3 <br /> <br /> K:\Personal\Darin Hyatt\2017 Proposals\GEO\Water Tower Siting - Lino Lakes\Water Tower Siting - Lino Lakes.docx <br />Samples retrieved during drilling will be returned to our laboratory where they will be <br />reviewed, classified using the Unified Soil Classification System (USCS) and logged <br />under the direction of a geotechnical engineer. Select samples may be set aside for <br />laboratory testing. We may perform routine laboratory tests on selected soil samples <br />obtained from the exploration. This may include determinations of natural moisture <br />content and gradations on select sand samples from the borings. <br /> <br />Such tests will aid in determining soil classification and properties and potential behavior <br />characteristics to help guide our recommendations. <br /> <br />5. Geotechnical Engineering Report <br /> <br />Information gathered for this project will be used to prepare four geotechnical reports. <br />The reports will summarize our findings and provide a discussion of subsurface soil and <br />groundwater conditions encountered in our borings and how they may affect the <br />proposed construction of foundations. The report will also provide recommendations for <br />subgrade preparation, estimates of ground water depths/elevations, site grading, and a <br />discussion of soils frost susceptibility and use as structural fill and site fill. <br /> <br />We will provide you and any identified members of your design/project team with a PDF <br />copy of our geotechnical reports. If requested, we will also provide you with an original <br />hard copy. <br /> <br />This geotechnical proposal is presented for engineering services to determine the <br />geotechnical properties of the soil at the specified site. It does not cover an <br />environmental assessment of the site, or environmental testing of the soil or <br />groundwater. <br /> <br />6. Lump Sum Fee <br /> <br />Services Site Estimated Cost* <br />Drilling Services: <br />Mob/demob of drilling rig, 2 standard <br />penetration borings to 25 feet each and 1 <br />standard penetration boring to 50 feet, <br />Environmental W ell and Boring Sealing <br />Records fee/filing and backfilling and <br />grouting boreholes per MDH requirements, <br />Gopher State One Call utility clearance. <br /> <br />Laboratory/Office Work: <br />Project Management, Project <br />Administration, Soil Classification, Boring <br />Logs, Well and Boring Sealing Record, <br />Laboratory Testing, Boring Location <br />Sketch, Geotechnical Report Preparation. <br />W Shadow Lake $3,950 <br />12th Avenue $3,950 <br />Birch/Joyner $3,950 <br />Rec Complex $3,950 <br />Total Lump Sum Fee $15,800 <br />* - if it is determined the site is not accessible to a truck-mounted rig and an ATV <br />track-mounted rig is need to complete the work add $750/site to the above costs. <br />