Laserfiche WebLink
<br />CITY COUNCIL <br />AGENDA ITEM 6D <br /> <br /> <br />STAFF ORIGINATOR: Diane Hankee, City Engineer <br /> <br />MEETING DATE: October 09, 2017 <br /> <br />TOPIC: Resolution No. 17-114, Accepting Quotes and Awarding a <br />Construction Contract, 2017 Trail Improvement Project <br /> <br />VOTE REQUIRED: 3/5 Vote Required <br /> <br /> <br />INTRODUCTION <br /> <br />Staff is requesting authorization to accept quotes and award the construction contract for the <br />2017 Trail Improvement Project. <br /> <br />BACKGROUND <br /> <br />The 2017 Trail Improvement Project includes: <br /> <br />Birch Street Trail Replacement <br />The Birch Street Trail Replacement project is a trail maintenance project located along <br />Birch Street between Deerwood Lane and Living Waters Lutheran Church. Enclosed <br />location map. The project is funded through the annual trail maintenance budget. <br /> <br />Century Farms Trail <br />The Century Farms Trail project includes the construction of a new trail connecting <br />Century Trail south the Century Trail east through the park. Enclosed location map. <br />The project is funded through park dedication. <br /> <br />Quotes for the project were received on October 6, 2017. The quotes were checked for <br />mathematical accuracy and tabulated. <br /> <br /> <br />CONTRACTOR BIRCH ST CENTURY <br />FARM TOTAL BID <br />Allied Blacktop Company $63,677.00 $140,810.00 $204,487.00 <br />Muellner Blacktop, Inc. Did not quote Did not quote Did not quote <br />Arcade Asphalt, Inc. $32,680.00 $54,870.00 $87,550.00 <br />Pearson Brothers, Inc. Did not quote Did not quote Did not quote <br />Lino Lakes Blacktop, Inc. Did not quote Did not quote Did not quote <br />