My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-09-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
10-09-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 2:29:44 PM
Creation date
3/14/2018 12:32:10 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/09/2017
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />STOP SIGN INSTALLATION <br /> <br />The traffic control at an intersection is critical to the operation of both intersecting roadways. If <br />incorrect traffic control is installed for the existing traffic conditions and topographic <br />characteristics of the intersection, unduly delays and even unnecessary accidents could occur. <br />The traveling public, especially persons not familiar with the area, typically drive based on <br />instinct. Drivers subconsciously evaluate their surroundings to determine if a stop sign or yield <br />sign should or shouldn’t be located on an intersection approach. It is very difficult to determine <br />85th <br />Percentile <br />Speed > 33 <br />mph <br />Council to consider <br />low cost traffic <br />calming measures <br />Council to consider <br />potential engineering <br />solutions <br />Additional Speed Enforcement <br />if perceived speed concern <br />is still present <br />(No further action by City Council) <br />NO <br />NO <br />YES <br />No further action <br />YES <br />Feasibility, Funding, and Installation <br />Review Period <br />85th <br />Percentile <br />Speed > 35 <br />mph <br />NO YES
The URL can be used to link to this page
Your browser does not support the video tag.