My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-13-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
11-13-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 2:39:46 PM
Creation date
3/14/2018 12:33:08 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/13/2017
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY COUNCIL <br />AGENDA ITEM 6B <br /> <br /> <br />STAFF ORIGINATOR: Diane Hankee, City Engineer <br /> <br />MEETING DATE: November 13, 2017 <br /> <br />TOPIC : Consider Resolution No. 17-128, Payment of Final Pay Voucher <br />No. 4, 2016 Aqua Lane to Black Duck Drive Trunk Water Main <br />Project <br /> <br />VOTE REQUIRED: 3/5 <br /> <br /> <br />INTRODUCTION <br /> <br />Staff is requesting council authorization for the Final Pay Voucher No. 4 in the amount of <br />$65,834.03 to GM Contracting, Inc. for the construction for the 2016 Aqua Lane to Black Duck <br />Drive Trunk Water Main Project. <br /> <br />BACKGROUND <br /> <br />The construction contract for the 2016 Aqua Lane to Black Duck Drive Trunk Water Main <br />Project was awarded to GM Contracting, Inc. on September 26, 2016 in the amount of <br />$1,077,549.82. The project included the following: <br /> <br />• The extension of a 12 inch diameter trunk water main directionally drilled from Aqua <br />Lane to Black Duck Drive. This improvement provided a secondary line to serve the <br />northwest portion of the City, and it loops the City’s system improving pressure and <br />flow. <br />• The extension of a 3 inch diameter sanitary sewer forcemain directionally drilled from <br />the intersection of West Shadow Lake Drive and Sandpiper Drive to Black Duck Drive. <br />It was cost effective to extend this utility at the same time as the water mian. This utility <br />was installed for future extension down West Shadow Lake Drive. <br />• A 12 inch diameter trunk water main connection from Well No. 6 to Birch Street. The <br />water main is being extended to strengthen the system. <br /> <br />The construction project is complete, and the final construction cost was $1,030,025.09. The <br />project was under budget, and we hereby recommend that the City of Lino Lakes approve <br />payment of Final Construction Pay Voucher No. 4 to GM Contracting, Inc. in the amount of <br />$65,834.03. <br /> <br />RECOMMENDATION <br /> <br />Staff recommends adoption of Resolution No. 17-128 Approving payment of Pay Voucher 4 <br />(final) to GM Contracting, Inc. in the amount of $65,834.03 for the 2016 Aqua Lane to Black <br />Duck Drive Trunk Water Main Project.
The URL can be used to link to this page
Your browser does not support the video tag.