Laserfiche WebLink
Comprehensive Stormwater Management Plan <br />Northeast Lino Lakes Drainage Improvement Project <br />WSB Project No. 2929-79 Page 5 <br /> <br />1.3.5.4 Rice Creek Watershed District Rules <br />The RCWD Rules in effect at the time of writing this CSMP are dated January 1, 2017. Future rule <br />revisions will require detailed review of this CSMP for compatibility with the proposed rule revisions and <br />may require updates to the CSMP itself. <br />1.3.5.5 Minnesota Statute 103E <br />Minnesota Statute 103E defines the drainage authority powers, benefitted party rights and procedures for <br />petitioning maintenance, alterations, diversions, impoundments and abandonment of the ditch and tile <br />system in the CSMP area. The RCWD is the drainage authority for ACD 55 and ACD 72 and any <br />proposed modifications or abandonment of the ditch system will require a petition by the benefitted <br />landowner to begin the public hearing proceedings. <br />1.3.6 Regulatory Requirement Overview <br />The approval of this CSMP does not waive any regulatory requirements for development within the study <br />boundaries, it simply provides a framework to review development projects within this area as part of a <br />greater regional system. All future projects must obtain all necessary and required permits prior to <br />construction from the appropriate regulatory agencies.