My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-27-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
11-27-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 3:17:53 PM
Creation date
3/14/2018 2:46:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/27/2017
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Stormwater Management Plan <br />Northeast Lino Lakes Drainage Improvement Project <br />WSB Project No. 2929-79 Page 13 <br />INFOSWMM <br />NODE <br />RCWD 2014 <br />INVERT ELEV <br />RCWD 2014 <br />INITIAL WSEL <br />ELEV. <br />REVISED INVERT <br />ELEV <br />REVISED INITIAL <br />WSEL ELEV. <br />JMT_004 883.25 886.11 883.25 886.11 <br />JMT_005 883.64 886.114 883.64 886.114 <br />JMT_006 884.49 886.357 884.49 886.357 <br /> <br />Finally, the inflow hydrograph from the URC model node LEAVING_SYSTEM2 was input at junction node <br />JM_016 in the HWC model as ACD72_LEAVE2_100YR. The HWC model was re-run and the total inflow <br />hydrograph at junction JMT_001 was exported from InfoSWMM and imported into the existing conditions <br />HEC-RAS model at RS 125004.6. <br /> <br />Table 3-7. Hardwood Creek Model Outflow Summary [cfs] <br /> <br />HWC NODE 2-YR 24-HR 10-YR 24-HR 100-YR 24-HR 100-YR 10-DAY <br />JMT_001 <br />RCWD 2014 80.7 202.5 685.6 932.0 <br />Revised Existing 99.8 214.3 669.3 903.2 <br />Difference [cfs] 19.1 11.7 -16.3 -28.8 <br /> <br />3.5 Rice Creek HEC-RAS <br />The existing conditions HEC-RAS model was updated with the inflow hydrographs from all the InfoSWMM <br />models and re-run to establish the existing water surface elevations in Peltier Lake for the CSMP study <br />and the results are summarized in Table 3-8. <br /> <br />Table 3-8. Peltier Lake Stage Summary [ft] <br /> <br /> 2-YR 24-HR 10-YR 24-HR 100-YR 24-HR 100-YR 10-DAY <br />PELTIER LAKE <br />STAGE <br />RCWD 2014 885.73 886.28 887.20 887.53 <br />REVISED EXISTING 885.76 886.41 887.22 887.51 <br />DIFFERENCE [FT] 0.03 0.13 0.02 -0.02 <br /> <br />Due to the relatively minor changes in stage at Peltier Lake, it was assumed that re-importing the stage <br />hydrograph into the InfoSWMM models would result in negligible changes to the overall InfoSWMM <br />results. As a result, the Peltier Lake stage data was not updated in the revised existing conditions <br />InfoSWMM modeling and the models presented above were used as the baseline existing conditions. <br />Detailed input and result tables from the existing conditions modeling may be found in Appendix B. <br />
The URL can be used to link to this page
Your browser does not support the video tag.