Laserfiche WebLink
Comprehensive Stormwater Management Plan <br />Northeast Lino Lakes Drainage Improvement Project <br />WSB Project No. 2929-79 Page 22 <br />Table 6-4. Required Live Storage by Region <br /> <br />BMP ID <br />Estimated <br />Live Storage <br />Required <br />[ac-ft] <br />Allowable <br />Bounce <br />[ft] <br />Min. Area for <br />Live Storage <br />[ac] <br />Max. Release <br />Rate <br />[cfs] <br />EAST 250 4 63 75 <br />CENTRAL 260 4 65 120 <br />WEST 50 4 13 135 <br />TOTAL 560 141 135 <br />6.3.3 Outlet Control Structures <br />Each regional NURP pond’s water levels will be controlled by an outlet control structure and operable <br />gate. In the event of a 100-year design storm, the gated will be closed to minimize the risk of increasing <br />flood stage on Peltier Lake, the ponds will be sized to include enough live storage to hold the water until <br />the gates are reopened after the flood threat on Peltier Lake has passed. The exact location and design <br />of these facilities will be determined as development in the CSMP area progresses. It will be expected <br />that the storage areas will experience a significant bounce in elevation during the 100-year storm event <br />and will need to be planted with a suitable planting palette that can tolerate periodic inundation to <br />maintain the vegetated buffer around the pond. The estimated peak discharges and timing of the 100- <br />year 24-hour event is shown in Table 6-5. <br /> <br />Table 6-5. 100-yr 24-hr Maximum Discharge Rate between Regions <br /> <br />BMP ID <br />Estimated Peak <br />Discharge <br />[cfs] <br />Estimated Event <br />Runoff Volume <br />[ac-ft] <br />Timing of Peak Elevation <br />[hrs. after start of <br />rainfall] <br />EAST 75 257 77.8 <br />CENTRAL 120 470.2 78.0 <br />WEST 135 526 78.2 <br /> <br />The gates will be operated by the City of Lino Lakes and shall be placed to control the release of water <br />from each regional storage facility. Each gate must be closed when Peltier Lake reaches an elevation one <br />foot below the 100-year flood elevation of 887.7 [NAVD88] on the rising limb of the lake stage hydrograph <br />and remain closed until the flood elevation on Peltier Lake recedes below the 100-year flood elevation of <br />887.7, on the falling limb of the lake stage hydrograph. <br />6.3.4 Low Floor and Low Entry Freeboard Requireme nts <br />The lowest floor and lowest opening of future buildings and structures near the regional BMPs must <br />adhere to the freeboard requirements presented in RCWD Table C6 and Chapter 1011: Stormwater, <br />Erosion, and Sediment Control of the City Code.