Laserfiche WebLink
WSB <br />Pavement Management Report <br />Page 111 <br />This treatment provides resurfacing from 3/8" to 3/4" thick and returns traffic use in one hour under average <br />conditions. This can be applied in multiple applications and provide minor reprofiling. Micro surfacing can also fill <br />wheel ruts up to 1 1/2" in depth in one pass and produces high surface friction. <br />PRESERVATION <br />An overlay involves placing a new layer of bituminous material on top of an existing asphalt surface. A mill and <br />overlay involves grinding all or a portion of the in-place asphalt surface and topping it with a bituminous wearing <br />course over the entire surface. This type of action provides a structural improvement to the roadway. We <br />recommended pavement coring to evaluate the subsurface conditions. Information such as depths of pavement <br />layers, signs of bonding and de -bonding, and distresses that are not visible from the road surface can be obtained <br />through pavement coring. <br />Texas underseal is a non -conventional pavement preservation method, which a chip seal is placed under an <br />overlay. The chip seal layer acts as stress relief membrane providing a crack resistance asphalt layer. We <br />recommend that the City consider Texas undersea) for overlay projects. <br />RECLAMATION <br />There are two conventional types of reclamation, which are full depth reclamation (FDR) and stabilized full depth <br />reclamation (SFDR). FDR involves grinding the asphalt pavement with a portion of the underlying base, followed <br />by an overlay or a surface treatment. SFDR is FDR with the addition of stabilizing additive, which are asphalt <br />based, chemical based, or compaction aids. The asphalt additives can be foamed asphalt or asphalt emulsion. <br />Reclamation brings the pavement condition back to a 100 (perfect condition) rating. <br />RECONSTRUCTION <br />Reconstruction includes removing and replacing the existing pavement and subgrade. Subsurface water <br />management is a significant component of a reconstruction project. Thus, addressing roadway drainage is <br />included in roadway reconstruction projects. Reconstruction also brings the pavement condition back to a 100 <br />(perfect condition) rating. <br />