My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2018-013 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2018
>
2018-013 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2018 3:30:53 PM
Creation date
4/2/2018 4:09:03 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
02/12/2018
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSB <br />Pavement Management Report <br />Page 14 <br />Unit pricing for the maintenance activities that were included in the 5 -year Capital Improvement Plan (CIP) and <br />PAVER analysis were provided by the City, which were obtained from recent project costs. The unit pricing <br />includes engineering, legal, financial, and administrative costs. Following are the unit pricing for each type of <br />maintenance activity. <br />Type of Activity Unit Pricing (Per Linear Foot) <br />Mill and overlay $ 65 <br />Full depth reclamation $ 95 <br />Reconstruction $ 235 <br />Under the 5 -year CIP, reconstruction costs were used to evaluate all the projects that fall under the "problem" <br />category. Although some of the roadway segments may be a candidate for full depth reclamation, further <br />investigation such as pavement forensics needs to be performed on the roadways to determine if there are <br />enough underlying good materials for a full depth reclamation. Thus, a more conservative approach was <br />conducted by applying the reconstruction costs than to utilizing the reclamation costs. <br />PAVER runs the analysis using unit pricing for all the maintenance activities in terms of square foot instead of linear <br />foot. All the unit pricing listed above was converted to the unit pricing that PAVER uses. An average road width of <br />32 -feet was used to run the model. <br />
The URL can be used to link to this page
Your browser does not support the video tag.