My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-28-13 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2013
>
01-28-13 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2014 2:03:43 PM
Creation date
4/9/2013 1:21:24 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/28/2013
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />AGENDA ITEM 6C <br /> <br />STAFF ORIGINATOR: Jason C. Wedel, City Engineer <br /> <br />MEETING DATE: January 28, 2013 <br /> <br />TOPIC: Consideration of Resolution No. 13-13 Approving <br />Plans & Specifications, CSAH 14 Pedestrian Bridge <br />over I- 35W <br /> <br />VOTE REQUIRED Simple Majority <br /> <br />INTRODUCTION <br /> <br />Staff is requesting council action to approve the plans for the pedestrian bridge. The <br />improvements include the installation of a pedestrian bridge over I-35W and minor trail <br />construction on either side. The project schedule is as follows: <br /> <br />January 28, 2013 Approve Plans <br />June, 2013 Open Bids <br />July, 2013 Start Construction <br />November, 2013 Construction Complete <br /> <br />BACKGROUND <br /> <br />Anoka County authorized the final design preparation of plans and specifications for the CSAH <br />14 pedestrian bridge over I-35W. The final design has been completed, reviewed and approved <br />by the City, Anoka County and the Minnesota Department of Transportation (Mn/DOT). <br /> <br />The estimated construction cost is $1,095,384, which does not include engineering, legal, <br />fi nancing, or administrative costs. Funding for the project is being partially provided by a <br />Federal Transportation Enhancement grant obtained by Anoka County and the balance is being <br />funded directly by the County. The County has requested City participation; however, we <br />currently do not have funding available for this type of project. If the County cannot identify <br />funding sources for 100% of the project it is possible that the project might not proceed. <br /> <br />The improvements include the construction of the bridge as well as the extension of a trail south <br />to tie into the existing trail at Woodland Drive and the extension of a trail north that will <br />terminate at Rondeau Lake Road. City staff is currently reviewing alignment options and costs <br />estimates for continuing the trail west along Main Street to Lake Drive. Once the necessary <br />information is obtained for that segment of trail the results will be brought back to the City <br />Council for discussion. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.