Laserfiche WebLink
City of Lino Lakes SWMP | February 8, 2013 Draft | 77 <br />5.2.3 Clearwater Creek RMU Subwatershed <br />Table 11 . RMU Specific Actions: Clearwater Creek RMU <br />Actions identified by Issue Category <br />WATER RATE & QUANTITY <br />Develop a stormwater runoff volume reduction plan for the Clearwater Creek RMU that emphasizes non -infiltration <br />based BMPs given the heavy hydric soils underlying the area. <br />WATER QUALITY <br />Integrate Clearwater Creek into district and site planning to preserve the natural amenities of this water course. <br />Address nutrient impairment of Bald Eagle Lake as identified in the TMDL study and in the implementation plan <br />when this effort is completed. <br />Address biological impairment of Clearwater Creek as identified in the TMDL study and implementation plan when <br />these efforts are completed. <br />WETLAND MANAGEMENT <br />Restore drained wetlands associated with abandoned ditch 47 to provide wetland mitigation credit for use in a <br />bank and to establish a greenway corridor valuable for open space, water quality, and flood control. <br />Investigate the current and future effects of the pipe and pond drainage system from the urban area just east of I - <br />35E and south of Ce dar Street for effects on the condition of this wetland complex. The highly susceptible portion <br />of the wetland complex is a hardwood swamp adjacent to the city of Hugo. <br />. <br />FLOODPLAIN MANAGEMENT <br />Target wetland restoration projects in the northern drainage ditch of ACD 55 (a tile system) to alleviate flooding <br />problems and potentially generate mitigation credit. <br />Address the potential flooding concerns in the urban area just east of I35E and south of Cedar Street: there are <br />several ponds that are expected to overtop in a high rainfall event. <br />PUBLIC DITCH SYSTEM <br />Coordinate with the RCWD in advance of repairs needed for ACD -55 (tile system). This system has been <br />identified as being ineffective at managing future runoff (potential pond flooding problems during high rain events) <br />which should be addressed via the mul ti -functional greenway corridor. <br />GROUNDWATER MANAGEMENT <br />No implementation activities identified. <br />NATURAL RESOURCES <br />Work with RCWD and land developer to implement Clearwater Creek restoration project between 20 th Avenue and <br />35E. <br />Work with RCWD to Conduct Clearwater Creek instream habitat improvement for the biotic impairment TMDL. <br />EROSION AND SEDIMENT CONTROL <br />No implementation activities identified. <br />REGULATIONS, PERMITTING AND REPORTING <br />Complete Subwatershed Management Plan. <br />MONITORING, MAINTENANCE AND INSPECTION <br />Monitor the wetland complex to the northwest of Bald Eagle Lake for signs of deterioration from the adjacent urban <br />drainage system. <br />Investigate the localized urban discharges into the wetland complex north of Otter and monitor the wetlands for <br />signs of stress. <br />PUBLIC PARTICIPATION, INFORMATION & EDUCATION <br />No implementation activities identified. <br />FINANCING <br />No implementation activities identified. <br /> <br />