My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-06-13 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2013
>
05-06-13 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2014 3:45:57 PM
Creation date
5/3/2013 4:50:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/06/2013
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Lino Lakes SWMP | February 8, 2013 Draft | 79 <br /> <br />5.3.3 Peltier RMU Subwatershed <br />Table 14 . RMU Specific Actions: Peltier RMU <br />WATER QUALITY <br />Avoid discharges to Peltier Lake through implementation of infiltration BMPs on non -hydric soil upland areas and <br />implementation of small site storage and biofiltration BMPs on hydric soil areas that are developing. <br />FLOODPLAIN MANAGEMENT <br />Target wetland r estoration projects in the northern drainage ditch of ACD 55 (a tile system) to alleviate flooding <br />problems and potentially generate mitigation credit. <br />Address the two areas within the City of Lino Lakes where there is less than 1 foot of freeboard on t he road. <br />REGULATIONS, PERMITTING AND REPORTING <br />Develop Subwatershed Management Plan utilizing the concepts already developed by the City for a large flow - <br />through wetland system. <br /> <br />5.3.4 Hardwood Creek RMU Subwatershed <br />Table 15 . RMU Specific Actions: Hardwood Creek RMU <br />WETLAND MANAGEMENT <br />Protect and buffer the high priority wetlands in the Hardwood Creek RMU <br />FLOODPLAIN MANAGEMENT <br />Ensure that existing culvert crossings will function under future conditions. <br />NATURAL RESOURCES <br />Address the wildlife barrier that exists as a result of the interstate and discuss options with MnDNOT to make <br />existing culvert a safer crossing for wildlife. <br />REGULATIONS, PERMITTING AND REPORTING <br />Develop Subwatershed Management Plan. <br /> <br />5.3.5 Upper Rice Creek RMU Subwatershed <br />Table 16 . RMU Specific Actions: Upper Rice Creek RMU <br />FLOODPLAIN MANAGEMENT <br />Conduct inspections and maintenance to prevent flooding of major roads in Upper Rice Creek RMU in areas <br />planned for industrial, commercial and medium density residential land use (URC_001 and URC_002 ). <br />Ensure that existing culvert crossings will function under future conditions. <br />REGULATIONS, PERMITTING AND REPORTING <br />Develop Subwatershed Management Plan . <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.