Laserfiche WebLink
City of Lino Lakes SWMP | February 8, 2013 Draft | 81 <br /> <br />5.3.10 Baldwin RMU Subwatershed <br />Table 21 . RMU Specific Actions: Baldwin RMU <br />WETLAND MANAGEMENT <br />Evaluate the potential to implement volume reduction practices in the catchments discharging to s tormwater - <br />sensitive wetlands which are at risk under current conditions . <br />REGULATIONS, PERMITTING AND REPORTING <br />Develop Subwatershed Management Plan . <br /> <br />5.3.11 Middle Rice Creek RMU Subwatershed <br />Table 22 . RMU Specific Actions: Middle Rice Creek RMU <br />NATURAL RESOURCES <br />Work with MnDOT to address corridor gaps and wildlife barriers in Middle Creek RMU. <br />WETLAND MANAGEMENT <br />Wetlands at risk from stormwater should be evaluated for reducing volume effects in the catchments. <br />REGULATIONS, PERMITTING AND REPORTING <br />Develop Resource Management System Plan. <br /> <br />5.3.12 Wilkinson RMU Subwatershed <br />Table 23 . RMU Specific Actions: Wilkinson RMU <br />REGULATIONS, PERMITTING AND REPORTING <br />Develop Subwatershed Management Plan. <br /> <br />5.4. Implementation Costs <br />The estimated costs for the City of Lino Lakes to implement the city -wide and RMU -specific actions <br />included in this implementation plan as defined in Section 5.1 are summarized in Table 24 . These actions <br />are broken down into 3 project types; 1) Capital Improvement Projects (CIP), 2) Programs , and 3) <br />Studies. Capital Improvement Projects include but are not limited to new stormwater capacity, quality or <br />volume control improvements as well as wetland mitigation or restoration activities. Programs include <br />ongoing education, inspection, maintenance, and pollution prevention activities that are necessary to <br />maintain the existing system and meet the requirements of the City’s NPDES permit. The Study category <br />includes projects necessary to evaluate the City’s system includ ing subwatershed drainage plans and <br />feasibil ity studies. <br /> <br />A ctions in the implementation plan as defined in Sections 5.2 and 5.3 are summarized in Table 25 . The <br />total estimated cost to implement this plan , including City -wide and all RMU Subwatershed Areas, is <br />$2,901,8 00 ov er 10 years, or approximately $290,18 0 per year. It should be noted, that some of the costs <br />should be recovered through surface water management impact fees collected in conju nction with <br />development . While there are some infrastructure costs included here, it is fairly minimal on <br />infrastructure projects . The majority of costs are related to maintenance of the existing system and <br />satisfying the programmatic requirements of the City’s NPDES permit. It is further assumed that once <br />the more detailed RMU Subwatershed Plans are completed, more of the infrastructure costs will be <br />defined so it can be included in developer fees for each area. <br /> <br /> <br />