My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/28/2018 Environmental Board Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Minutes
>
2018
>
02/28/2018 Environmental Board Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2018 10:57:29 AM
Creation date
6/18/2018 10:57:18 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Minutes
Meeting Date
02/28/2018
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Enivornmental Board <br />February 28, 2018 <br />Page 4 <br />treatment. <br />Rice Creek Watershed must review the surface water /Stormwater issues for <br />compliance to impervious surface rules and discharge rate control. <br />RCWD- needs to review and <br />Developer needs to supply a plan for stormwater and the ponds needs to have an <br />annual inspection. <br />Need to keep playground out of Buffer <br />Mr. Asleson would like to add recommendation- Infiltrometer test on the infiltration <br />ponds <br />Drinking Water Protection — This is in a drinking water service management area. <br />Special precautions should be made during construction and as part of the SWPPP to <br />take extra caution with equipment on the site. A containment under any fueling <br />stations is required. A concrete washout area must be defined and designed so that <br />concrete waste does not touch or spilled / dumped on existing soils <br />Tree Preservation - no trees on site. <br />Lighting- the photometric plan for lighting the site meets the requirements of the <br />City. All fixtures should be dowward focused, low intensity and cut-off type lens <br />Landscape Plan - Landscaping on the road ROW corners must be pulled back 30 <br />feet in both directions for road site -line reasons. <br />Tree and plants species matrix is appropriate. The native planting must be <br />accompanied with a 5 year maintenance plan. The plan and the company must be <br />approved by the city. <br />All sod areas must be irrigated and planted with a low maintenance fesue sod be <br />used. It is highly recommended that a system with ground moisture sensors be <br />installed. <br />Recycling- A description of state law requirements of business recycling must be <br />provided. <br />Mr. Sullivan made MOTION to approve this plan contingent on RCWD <br />recommendation for proper surface water management on this site,along with the <br />Environmental Board comments and recommendations including a infiltrometer test. <br />Ms. Adrzejewski seconded the motion. Passed 6-0 <br />C. Distinctive Elements Tile and Design <br />APPROVED MINUTES <br />
The URL can be used to link to this page
Your browser does not support the video tag.