My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-02-2018 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
07-02-2018 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:05:48 PM
Creation date
7/3/2018 12:10:37 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/02/2018
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
600 Town Center Parkway, Lino Lakes, MN 55014-1182 <br />City Hall: 651-982-2400 ∙ www.ci.lino-lakes.mn.us <br />1Net area required as defined as contiguous buildable land <br />2Per Shoreland Management Overlay District <br /> <br /> <br />Shoreland Management Overlay District (Chapter 1102) <br /> <br />• Reshanau Lake is classified as a Recreational Development Lake per the MNDNR. <br />• The Ordinary High Water Level (OHWL) is 883.5. <br />• For those riparian lots on the east side of West Shadow Lake Road that directly abut <br />Reshanau Lake: <br /> <br /> R-1 Requirements R-1X Requirements <br />Min. Lot Size1 20,000 sf 20,000 sf <br />Min. Lot Width2 80 ft 90 ft <br />Min. Lot Depth 135 ft 135 ft <br />Building Setback (feet) <br />-From Local Streets 30 ft 30 ft <br />-From OHWL3 <br />--Principal 75 ft 75 ft <br />-Accessory 75 ft 75 ft <br />-Side Yard <br />--Principal 10 ft 10 ft <br />--Accessory 5 ft 5 ft <br />Impervious Surface4 30% 30% <br />1Only land above the OHWL can be used to meet the lot area standards <br />2Lot width standards must be met at both the OHWL and the building setback line <br />3One water-oriented accessory structure may be setback 10 feet from the OHWL <br />4Per Shoreland Management Overlay District <br /> <br />Subdivision Ordinance (Chapter 1001) <br /> <br />• Property owners wishing to subdivide their parcel after municipal water and sanitary <br />sewer has been installed will be required to submit Land Use Applications for <br />Preliminary Plat and Final Plat in compliance with the Subdivision Ordinance. <br />• Property owners will hire a surveyor and/or engineer to prepare the required documents <br />for subdivision. <br />• The preliminary plat and final plat are reviewed by the Planning & Zoning Board and <br />City Council. <br />• The entire process typically takes 120 to 180 days. <br /> <br />Staff would be happy to meet with property owners and their surveyor and/or engineer to discuss <br />the process. Please feel free to contact Katie Larsen, City Planner, at (651) 982-2426 to discuss <br />or schedule a meeting.
The URL can be used to link to this page
Your browser does not support the video tag.