My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-24-13 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2013
>
06-24-13 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2014 2:51:07 PM
Creation date
6/25/2013 3:56:14 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/24/2013
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />CITY COUNCIL <br />AGENDA ITEM 6 C <br /> <br /> <br />STAFF ORIGINATOR : Jason C. Wedel, City Engineer <br /> <br />MEETING DATE : June 24 , 20 13 <br /> <br />TOPIC : Consider Resolution No. 13 -79, Approve Plans and Specifications <br />and Authorize Advertisement for Bids, 2013 Overlay Project <br /> <br />VOTE REQUIRE D : 3/5 Vote Required <br /> <br /> <br />BACKGROUND <br /> <br />In accordance with the City’s Pavement Management Policy that was adopted by the City Council <br />on May 10, 2005 , streets are selected annually for milling and overlaying . On March 25, 2013 the <br />City Council authorized the preparation of plans and specifications for the 2013 Overlay Project . <br />Candidate streets were selected based on recommendations from the Pavement Management <br />Report, Public Works input, and feasibility of locations. <br /> <br />The original project scope presented to the City Council on March 25 , 2013 included Marvy Street, <br />Jon Avenue , Rice Lake Lane, Rice Lake Drive, Rice Lake Court, and Ulmer Drive . <br /> <br />Overlaying is typically a maintenance activity that includes patching of the existing street, followed <br />by the pla cement of a bituminous wearing course of the entire surface. As part of the design of the <br />i mprovements , pavement corings were perf ormed on the existing streets . It was discovered that <br />there is an inadequate amount of existing pavement to perform a tradit ion al mill and overlay on <br />some of the streets . This project will therefore require the complete reclamation of the existing <br />bituminous in place and 3 -1/2 inches of new bitum inous on Rice Lake Lane, Rice Lake Court and <br />Jon Avenue . The remaining streets, R ice Lake Drive, Ulmer Drive, and Marvy Street will be edge <br />milled and 1 -1/2 inches of new bituminous will be installed. <br /> <br />The City’s budget for 2013 Pave ment Management Projects is $490,00 0. This year’s projects <br />breakdown as follows: <br /> <br /> 2013 Mill & Overlay Projec t (including e ngineering) $166,500 <br /> 2013 Reclamation Project (including engineering) $270,800 <br /> 2013 Sealcoating (i nc luding engineering & striping) $ 65,000 <br /> Total Cost $502,300 <br /> <br />Due to the fact that this year’s sealcoating project is smal ler than previous years and is well below <br />the $100,000 threshold required for public bidding, we will be requesting quotes for the sealcoating <br />and bring them back to the City Council for approval. We will also bring back separate quotes for <br />the striping.
The URL can be used to link to this page
Your browser does not support the video tag.