My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/02/2018 EDAC Packet
LinoLakes
>
Advisory Boards & Commissions
>
Economic Development Advisory Committee
>
Packets
>
2018
>
08/02/2018 EDAC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2022 12:00:54 PM
Creation date
7/27/2018 11:17:03 AM
Metadata
Fields
Template:
EDAC
EDAC Document Type
EDAC Packet
Meeting Date
08/02/2018
EDAC Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sanitary Sewer <br />The City has studied the sanitary sewer in this area and plans for a forcemain and lift <br />station improvement are being developed now. The development could be served with <br />gravity sewer that would flow southwest to the planned lift station. <br />Wntarmnin <br />There is currently no water main serving the site. The City is developing plans for a trunk <br />watermain improvement that would serve this site and would be extended from through <br />the development from Woodbridge Lane to Hodgson Road and looped. <br />Powerline <br />A three-phase overhead power line runs along the eastern boundary of the property line <br />within the right-of-way. Section 1007.024, 3 of the Zoning Ordinance states that all <br />utilities serving a two family and townhome development, including telephone, <br />electricity, gas, and cable, shall be installed underground. Consideration to burying the <br />three phase power line should be given in coordination with any proposed Hodgson Road <br />improvements. <br />Public Safety <br />The Police Department has reviewed the plans. The attached memo notes that a traffic <br />study must be completed to ensure traffic safety at the proposed access points. More <br />detailed comments will be provided regarding lighting, access, etc. with the preliminary <br />plat application. <br />Next Steps <br />If the request is approved, the next step would be a land use application for Rezoning <br />from GB (General Business) to PUD (Planned Unit Development) and PUD <br />Development Stage/Preliminary Plat review. <br />SUMMARY <br />The proposed plans generally meet the goals, policies and standards of the <br />Comprehensive Plan and the Hodgson Road and County Road J Master Plan. <br />Construction of residential homes will support and catalyze future commercial <br />development in the area, including the restaurant planned by this developer. However, <br />there are a number of improvements to the plans that should be addressed to meet the <br />standards outlined in Hodgson Road and County Road J Master Plan, primarily: <br />• The applicant will need to provide pedestrian and bike circulation throughout the <br />development. Proposed pedestrian and trail connections and design should be <br />consistent with the Master Plan and Comprehensive Plan. <br />N. <br />
The URL can be used to link to this page
Your browser does not support the video tag.