My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-10-2018 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2018 Park Board Packets
>
09-10-2018 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 2:06:27 PM
Creation date
9/6/2018 2:06:04 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
09/10/2018
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSERT CLIENT LOGO ARENA ACRES MASTER PLAN 20’ <br />SCALE IN FEET <br />10’0’40’ <br />Project Number: 012396-000 <br />August 9, 2018 <br />K:\012396-000\Cad\Exhibits\012396-000 Arena Acres ConceptsConcept 1 <br />EXISTING <br />BASKETBALL <br />COURT <br />EXISTING <br />PLAYGROUND <br />EXISTING <br />WOODED AREA OPEN LAWN <br />SHELTER <br />8’ BITUMINOUS <br />TRAIL <br />EXISTING <br />TREE (TYP) <br />PLAZA <br />PROPOSED <br />SHADE TREE <br />(TYP) <br />CONCEPT SUMMARY: <br />• LARGE OPEN LAWN WITH TRAILS ON BOTH SIDES <br />• SHELTER WITH PLAZA AREA <br />• SHADE TREES ALONG TRAILS ANDALL STREETWOOD DUCK TRAIL <br />ESTIMATE OF PROBABLE COSTS: $110,000 <br />*COSTS ARE PRELIMINARY BASED ON A CONCEPTUAL <br />PLAN ONLY AND DO NOT REFLECT ANY ACTUAL OR <br />UNKNOWN SITE CONDITIONS OR POTENTIAL SOIL <br />CORRECTIONS THAT WOULD AFFECT THE FINAL <br />CONSTRUCTION COSTS.
The URL can be used to link to this page
Your browser does not support the video tag.