Laserfiche WebLink
Plumbing Permit 11.00 per fixture ($67.00 minimum fee) <br />L:wer Connection Inspection Fee $200.00 <br />Water Connection Inspection Fee <br />Contractor License Verification <br />Contractor Lead Certification Verification (effective Feb 1, 2011) <br />$250.00 <br />$5.00 per permit <br />$5.00 per permit <br />Contractor License $50.00 <br />Metropolitan Council SAC (Sewer Availability Charge) Per Met Council <br />'/a" Water Meter City cost plus 10% handling fee <br />1" Water Meter City cost plus 10% handling fee <br />MXU Unit City cost plus 10% handling fee <br />Touch Pad $18.00 <br />Curb Stop Covers $70.00 <br />Septic Installation or Repair Permit $250.00 <br />Septic Pumping Permit $10.00 <br />molition Permit $67.00 <br />Lawn Sprinkler/Irrigation System Permit (effective June 26, 2008) $67.00 <br />Irrigating or Watering of New Landscaping Permit (sod or seed) No Charge <br />Driveway Replacement Permit $67.00 <br />Sign Permit: Existing Billboard <br />Sign Permit: Permanent <br />Sign Permit: Sandwich Board <br />Sign Permit: Temporary (portable/banner) <br />$85.00 per year <br />See Building Fee Table <br />$25.00 <br />$25.00/Term <br />Fee Refund — Per applicant request, City staff may refund permit fees up to 80% for voided permits. <br />Plan review fees and state surcharge fees are non-refundable. No refund shall be provided if permit has expired. <br />All permits issued are subject to applicable State surcharge fees. <br />* Inspections made outside of normal business hours is a three-hour minimum charge <br />** Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, <br />overhead, equipment, hourly wages, and fringe benefits of the employees involved. <br />* * * Actual costs include administrative and overhead costs. <br />escrow may be required, as determined by the City Engineer, to cover all costs incurred by the City for plan <br />revision and construction observation. <br />5 <br />