My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-03-13 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2013
>
09-03-13 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2014 1:51:27 PM
Creation date
9/25/2013 8:55:46 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/03/2013
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21.3Require a traffic impact analysis for all development projects within the AUAR <br />area. The traffic impact analysis will assist the City and other road authorities in <br />determining the appropriate mitigation measures that are required to mitigate <br />impacts of a specific development proposal. <br />21.4Work with appropriate road authorities to mitigate the impact of the additional <br />traffic on the on the regional system, specifically Interstates 35W and 35E, by <br />reconstructing each to provide a six-lane cross-section consistent with the <br />recommendations outlined in the I-35 IRC. It should be noted that it was <br />determined that an expansion will be necessary even without the development <br />scenarios used in this analysis. As the interstates serve a much larger area, the <br />projected growth of the entire Twin Cities region should warrant expansion by the <br />year 2030. <br />21.5Prioritize alternative travel modes within the AUAR study area and require <br />project proposers to address alternative travel modes (e.g., buses, bicyclists, and <br />pedestrians) by identifying appropriate accommodations. <br />21.6Consider the need for additional infrastructure improvements (see item #21.2) in <br />future updates or amendments to the Comprehensive Plan. Submit the plan <br />update to the appropriate agencies (i.e., FHWA, MnDOT, Met Council, etc.). <br />21.7Require project proposers to follow all appropriate guidelines and policies related <br />to traffic nose and noise walls. <br />21.8Require that site plans for each of the developments include measures suchas <br />appropriate setback distances, earthen berms, noise walls, and appropriate site <br />design to reduce the impact of traffic noise to residential areas. <br />21.9Continue to require the implementation of the conditions of approval for the Eagle <br />Brook Church relating to mitigating traffic impacts. <br />21.10Achieve effective traffic operations within the city by requiring that site plans <br />make use of access management practices to promote sate, effective traffic flow. <br />21.11Require project proposers to follow the Anoka County Highway Department <br />Development Review Process Manual (dated December 2003.) <br />21.12Continue to coordinate capital improvement programming with applicable <br />transportation authorities. <br />9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.