Laserfiche WebLink
WS — Item 8 <br />WORK SESSION STAFF REPORT <br />Work Session Item No. 8 <br />Date: November 6, 2017 <br />To: City Council <br />From: Jeff Karlson, City Administrator <br />Re: Public Works Facility <br />Background <br />During the Council Work Session on May 1, 2017, Quinn Hutson, Principal Architect for <br />CNH Architects, presented a Public Works Site Analysis and Space Needs Study. Mr. <br />Hutson identified three options in the study along with the cost estimates for each option. <br />Mayor Reinert was of the opinion that CNH did not provide an option to remodel the <br />existing facility. There has been much discussion and debate the last several months <br />about what the City Council should do. <br />Public Services Director Rick DeGardner requested that Mr. Hutson provide a more in- <br />depth explanation of his evaluation regarding Option Al, which was to remodel and <br />expand the existing public works building. <br />Attached is an Addendum that Mr. Hutson prepared last week. The Public Works Site <br />Analysis and Space Needs Study are also attached. Hutson specifically references pages <br />28 through 33, which illustrates the deficiencies and scope of noncompliant code issues <br />in the public works building. <br />Requested Council Direction <br />Staff is looking for further direction from the Council. <br />Attachments <br />October 30, 2017 Addendum to Public Works Facility Study <br />April 11, 2017 Public Works Site Analysis and Space Needs Study <br />