Laserfiche WebLink
Option <br />Al <br />Layout <br />Description <br />Option Al is located at the current Public Works and Senior Center Facility site. This option includes extensive remodeling of the existing Public <br />Works and Senior Center Facility into Public Works' office space and vehicle maintenance area. The expansion includes additional office, <br />additional vehicle maintenance, departmental shops and vehicle storage. The existing salt building and material storage bins will be reused. Due <br />to the limitations of the buildable area and the location of the existing cell tower, a portion of the vehicle storage is rotated at a 120 degree angle. <br />This option would involve a total gutting of the existing building as needed to address deficiencies in the current building related to accessibility, <br />energy code, fire suppression and mechanical systems. Option Al and the following option by using the existing public works site will also require <br />an extension of the municipal water service and municipal sanitary service to the site. <br />Due to the site layout limitations working around the existing office and maintenance building, the existing cold storage buildings will not be able to <br />remain. This will reduce the total available storage for the Public Works department until Phase 2 is built, and may also result in the need to build <br />Phase 2 sooner than the other option in order to meet the city's growth. <br />1 Pros <br />I <br />I • Re -use of existing Public Works building structure <br />I • Use of existing Salt Building <br />I • Use of existing Material Storage Bins <br />I • Use of existing miscellaneous site storage <br />I • Re -use of existing site <br />I • Large buildable area <br />I <br />I <br />I <br />I <br />• <br />• <br />Cons <br />• Potential long construction period of existing building disrupting operations <br />• Cost of bringing new Water main to site due to fire suppression requirements <br />• Loss of use of existing ice rink and cost to remove <br />• Loss of use of existing baseball field and cost to remove <br />• Cost of remodel based on code and handicapped accessibility deficiencies <br />• Non -efficient floor plan of vehicle storage to fit site and keep existing building <br />• Cost of bringing municipal sanitary sewer to site (or impacts of large storage <br />tank and regular pumping for floor drains and wash bay sanitary) <br />• Reduced facility life expectancy and increased maintenance for the remodeled <br />portion of the building compared to an all new facility <br />Total Square Footage <br />• Remodel 12,752 s.f. <br />• New 67,582 s.f. <br />• Total 80,334 s.f. <br />• <br />• <br />• <br />22 Public Works Site Analysis and Space Needs Study <br />