My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02-04-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
02-04-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2021 9:36:00 AM
Creation date
2/1/2019 3:40:41 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/04/2019
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Option <br />A2 <br />• <br />• <br />• <br />Layout <br />Description <br />Option A2 is located at the current Public Works and Senior Center Facility site. This option provides for an all -new Public Works Facility which <br />includes office, vehicle maintenance, departmental shops and vehicle storage. The existing salt building, cold storage garage and material storage <br />bins will be reused. <br />Since this option removes the existing 45 year old building, it provides the flexibility to place the building on the site in a more advantageous layout. <br />This results in a more compact building footprint, better screening of the building to the east neighborhood, and the option for drive -through parking <br />for large equipment within the storage garage. This site option also allows for the continued use of the newer of the two existing cold storage <br />garages which will provide more available space for the Public Works department, especially until Phase 2 is added. Option A2, using the existing <br />public works site, requires an extension of the municipal water service and municipal sanitary service to the site. <br />Pros <br />• Use of existing salt building <br />• Use of existing material storage Bins <br />• Use of existing miscellaneous site storage <br />• Use of existing cold storage garage <br />• Longer life -expectancy and reduced maintenance for an all new facility <br />• Large buildable area <br />• Drive through stalls for large vehicle storage parking <br />• Flexibility in building placement to best fit uses and site <br />Cons <br />• Cost of demolishing existing facility <br />• Disruption of operations during construction period <br />• Cost of bringing new water main to site for fire suppression requirements <br />• Loss of use of existing ice rink and cost to remove <br />• Loss of use of existing baseball field and cost to remove <br />• Cost of bringing municipal sanitary sewer to site (or impacts of large storage <br />tank and regular pumping for floor drains and wash bay sanitary) <br />Total Square Footage <br />• Remodel None <br />• New 79,503 s.f. <br />• Total 79,503 s.f. <br />• Existing Cold Storage 4,835 s.f. <br />• <br />• <br />• <br />24 Public Works Site Analysis and Space Needs Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.