Laserfiche WebLink
Option <br />B1 <br />Layout <br />Description <br />Option B1 is located adjacent to Fire Station #2. This option includes a new Public Works Facility which includes office, vehicle maintenance, <br />departmental shops and vehicle storage. The existing salt building and material storage bins will be reused at the existing Public Works site. <br />This option would allow for the use of the existing public works storage buildings throughout the construction period reducing operational disruption <br />and cost during construction. Option B1 would also allow for the continued use of the north site facilities after construction until they reach there <br />anticipated life -expectancy allowing for more flexibility and space for the Public Works department, especially until Phase 2 is added to the building. <br />• <br />I, I <br />I Pros <br />• <br />• <br />• Existing municipal sanitary sewer connection located on site <br />• Existing municipal water main connection located on site <br />• Use of existing ice rink on Site A <br />• Use of existing baseball fields on Site A <br />• Efficient floor plan of vehicle storage <br />• No disruption at the current Public Works facility during construction <br />• Located adjacent to Fire Station #2 <br />• Closer to future population density as Lino Lakes grows <br />• Existing storage buildings at north site can continue to be used <br />Cons <br />• Smaller buildable area creates minimal clearances for site functions <br />• Existing salt building is located on Site A <br />• Existing material storage bins are located on Site A <br />• High visibility from future road <br />Total Square Footage <br />• Remodel None <br />• New 76,017 s.f. <br />• Total 76,017 s.f. <br />• Ex. Public Works Storage 14,799 s.f. <br />• <br />• <br />26 Public Works Site Analysis and Space Needs Study <br />