Laserfiche WebLink
COST ESTIMATE <br />Option Al <br />Remodel & Expansion <br />Phase 1 <br />• <br />Option A2 <br />New Facility at Existing Site <br />Phase 1 <br />• <br />Option B1 <br />New Facility at Fire Station Site <br />Phase 1 <br />• <br />Cost Estimate Summary <br />Low Cost <br />Public Works Facility <br />Sanitary Sewer and Water <br />Total <br />(2017 Dollars) <br />$ 9,707,342 <br />$ 360,000 <br />$ 10,067,342 <br />*Inflation not taken into account in this estimate <br />High Cost <br />Public Works Facility <br />Sanitary Sewer and Water <br />Total <br />(2017 Dollars) <br />• <br />$ 12,195,113 <br />$ 360,000 <br />$ 12,555,113 1 <br />Low Cost <br />Public Works Facility <br />Sanitary Sewer and Water <br />Total <br />(2017 Dollars) <br />$ 10,040,359 <br />$ 360,000 <br />$ 10,400,359 <br />*Inflation not taken into account in this estimate <br />High Cost <br />Public Works Facility <br />Sanitary Sewer and Water <br />Total <br />(2017 Dollars) <br />• <br />$ 12,458,171 <br />$ 360,000 <br />12,818,171 <br />Low Cost <br />Public Works Facility <br />Total <br />(2017 Dollars) <br />9,922,715 <br />$ 9,922,715 <br />*Inflation not taken into account in this estimate <br />High Cost <br />Public Works Facility <br />Total <br />(2017 Dollars) <br />• <br />$ 12,380,093 <br />$ 12,380,093 <br />The cost estimates shown above represent our teams professional opinion of probable construction cost based on the uses proposed, and typical <br />construction costs for similar facilities within the greater metropolitan area. The low cost to high cost range represents the preliminary level of the <br />designs done within this study, as well as the range in quality, life -cycle, and aesthetic choices that would be reviewed and selected by the city during <br />the design process. The costs, as indicated are current construction costs and an inflation factor would need to be applied when a specific time line <br />is developed. <br />The prices shown represent the estimated hard costs of the site and building construction shown in each option layout and vary only about $500,000 <br />when comparing the Low Cost for each option or 5% of the total cost. However, there are other cost factors not indicated that should also be taken <br />into consideration when comparing options that would create a greater final cost differential between options. A partial list of these items include: <br />• Operational cost to move Public Works functions off -site during construction for Site A options <br />• Loss of use of ball field and hockey rink at Site A if expansion occurs there <br />• Additional maintenance costs for reused portions of the existing structure under Option Al, <br />compared to an all -new facility in the other options <br />• Ability to continue to use one existing cold storage building under Option A2 and two existing <br />cold storage buildings under Option B1, thus postponing the date when Phase 2 of the Public <br />Works storage shown in each option layout would be needed <br />CNH <br />ARCHITECTS 35 <br />