Laserfiche WebLink
Description of ImprovementsEstimated Costs <br /> <br />1. Lighting $15,000.00 <br />2. Trash Disposal Structure $20,000.00 <br /> <br />3. Curbing / Islands / Delineators $15,000.00 <br /> <br />4. Storm Drainage Systems / Sewers / Catch $25,000.00 <br /> <br />Basins / Culverts / Swales <br />5. Private Trials and / or Sidewalk $12,000.00 <br /> <br />6. Driveway / Curbcut / Parking Lot / Fire Lane $60,000.00 <br /> <br />7. Watermains / Hydrants / Sanitary Sewers $25,000.00 <br /> <br />8. Landscaping $35,000.00 <br /> <br />9. Site Grading $0.00 <br /> <br />10. Erosion Control $8,000.00 <br /> <br /> Total Estimated Cost of Developer $215,000.00 <br /> <br />Improvements <br /> <br /> Security Requirement (Total * 35%) $75,250.00 <br /> <br /> <br /> <br />III. As-Built Survey <br /> <br />The Tenant -built <br />survey, that all site grading complies with the grading plan prior to <br />issuance of building permits. The as-built survey must include, but is not <br />limited to, proposed and final contours with adequate elevation shots to <br />show conformance, property irons (to be exposed in field), low floor and <br />low opening elevations, and the 100-Year High Water Level (HWL) of all <br />ponds, lakes, and wetland areas if applicable. <br /> <br /> <br />IV.COMPLETION DATE. <br /> <br />If the activities authorized by site and building plan approval are not initiated <br />within twelve (12) months from the final execution of this agreement, then <br />Developer Tenant will need to start the site and building plan approval <br />process from the beginning. <br /> <br />V. GUARANTEE. <br /> <br /> <br />A.The Tenant Developer will fully and faithfully comply with all terms and <br />conditions of any and all contracts entered into by the Tenant Developer. <br />Concurrently with the execution hereof by the Tenant Developer, the <br />Tenant Developer will furnish to, and at all times thereafter maintain with <br />the City, a cash deposit, certified check, or Irrevocable Letter of Credit, <br />based on thirty-five (35 %) percent of the total estimated cost of Tenan <br />Developer's On-site Work. An Irrevocable Letter of Credit shall be for the <br /> Lino Lakes McD Changes Site Performance Agreement 091113 rev JW 091813 .doc page 3 of 9 <br /> <br />